Page 46 - FY 2025 Adopted Operating Budget and Business Plan
P. 46

Business Plan                                             Return to Table of Contents





                                       Champion Great Neighborhoods

                                        Goal 2: Expand and Enhance the City’s Image
                                               Objective 2: Develop a Sense of Place
                         Project                   Performance Measure(s)                 Department(s)
             CGN   Park Improvement Projects   Overall Satisfaction with Programs   Parks & Recreation
             2.2.1                            and Facilities
             Summary:

             Julia Burgen Park Trail – UTA Connection                 Description       Estimated     Actual
             There is an existing 1.06 miles of trail currently in Julia               Completion   Completion
             Burgen Park. This project involves adding approximately .3   Julia Burgen Park Trail –   Jan. 2024
             miles of concrete trail that will provide a connection from   UTA Connection
             the existing trail to the on-street bike path along Pecan   River Legacy Park Trail   Oct. 2024
             Street, ultimately linking to the UTA campus. Construction   Realignment – Phase I/II
             on this project is anticipated to begin in late summer/early   River Legacy Park Trail   Winter 2024
             fall 2023.                                          West Connection
                                                                 Richard Simpson Park   Spring 2024
             River Legacy Park Trail Replacement – Phase I/II:   Improvements – Phase II
             Realignment of approximately 2.4 miles of 12-ft. wide   Rotary Dream Park –   Spring 2024
             concrete trail due to river encroachment. The project   Phase II
             includes the preparation of bid documents and the   Helen Wessler Park    May 2025
             construction of a new trail. Plans are finalized and   Replacement
             construction is anticipated to begin in summer 2023.    High Oak Park – Phase II   Spring 2025

             River Legacy Park Trail West Connection             Arlington Tennis Center   Oct. 2024
             Extension of 12-ft. concrete trail westward to meet Fort
             Worth’s Trinity Trail system. The project includes the   Heartfulness Sculpture   Late Spring
             preparation of bid documents and the construction of a                    2025
             new trail linking our two trail systems.            Lana Wolff Linear Park   Early 2026
                                                                 2023 Bond Projects    TBD
             Richard Simpson Park Improvements – Phase II:
             Additional improvements at Richard Simpson Park. The
             master plan calls for a nature play area, fitness stations,   Rotary Dream Park – Phase II
             additional parking, a scenic outlook, floating public safety   Develop Phase II of Rotary Dream Park, the additions will
             boat dock and fishing pier. The project includes the   include the relocation of the Dream sculpture which will be
             preparation of bid documents and the construction of new   from its current location and enhance the landscape and
             improvements.                                     hardscape areas around the new Rotary sculpture that
                                                               celebrates 100 years of dedication, vision, and involvement
             High Oak Park – Phase II:                         in Arlington.
             High Oak Park was originally dedicated in November 2014
             with modest amenities, including a walking path. Phase II is
             funded through the 2018 bond and will include a much-  Helen Wessler Park Replacement:
             needed playground and enhance current amenities.    After the land swap with AISD became official in fall of
                                                               2023, parks began design on the New Helen Wessler Park.
             Arlington Tennis Center:                          The project features a destination splash pad and large
             Our National Tennis Association award-winning Tennis   playground with many inclusive components.
             Center has hosted many high school and collegiate events,
             as well as a Rafael Nadal camp. The aging complex is   Lana Wolff Linear Trail:
             lacking much needed infrastructure, including restrooms,   A section adjacent to Julia Burgen Park along the Johnson
             roofing and HVAC systems. This renovation project will   Creek corridor will be home to the Lana Wolff extension.
             address those basic needs for the ATC to continue to grow.  The quarter-mile addition of trail will get one step closer to
                                                               connection to Meadowbrook Park.