Page 107 - KennedaleFY24AdoptedBudget
P. 107

OVERVIEW: STREET IMPROVEMENT FUND

               The Street Improvement Fund sustains and optimizes the structural life of the City's roadways in
               the most effective manner, provides preventive maintenance to existing concrete and asphalt
               streets, and develops capital projects for major street construction. Additionally, the Street
               Improvement Fund provides quality parks, open spaces, and trails to enhance the quality of life
               for residents.

               Kennedale leverages resources by working with TxDOT and Tarrant County. Street rehabilitation
               is performed by Tarrant County Precinct 2 under an Inter-Local Agreement, wherein the city
               pays for the materials and the county provides the labor and equipment. Also, if funding is
               available, and if we qualify, the North Central Texas Council of Governments (NCTCOG) provides
               grants for sidewalks and crosswalks via the Safe Routes to Schools program; e.g. Crestdale
               neighborhood, which we anticipate going into construction in early 2024.

               Little School Road was included in a voter-approved Tarrant County Transportation  bond
               package. This extension will not  only provide  access for future  development  but increase
               connectivity and traffic movement and strengthen emergency response by providing an above-
               grade railroad crossing to allow access to the western portion of the City and portions of the
               extraterritorial jurisdiction (ETJ).

               Included in this budget are two new full-time positions and an additional $127,000 in Street
               Maintenance.


                                                    SHORT-TERM GOALS

                  Continue partnership for professional services to include interlocal agreements with Tarrant
                   County Precinct 2 for asphalt street rehabilitation, pavement markings and drainage ditch
                   improvements
                  Complete the “Safe Route to School” Project, Crestwood Neighborhood, by mid-2024
                  Continue to conduct right-of-way, water, sanitary sewer and stormwater inspections
                  Invest in an annual concrete pavement panel replacement contract
                  Invest in a pavement asset management system, to assess and improve our pavement
                   network system condition
                  Install “Story Walk” along Sonora Park
                  Obtain a commercial grade, heavy duty gas powered 96” cut mower
                  Add at least one additional public works technician member to our current staff


















                                                   CITYOFKENNEDALE.COM/BUDGET                              104
   102   103   104   105   106   107   108   109   110   111   112