CITY OF SAGINAW
                                GOALS, OBJECTIVES, AND PERFORMANCE MEASURES
                                                        2022-2023


                                                    PUBLIC SERVICES

                             Annual Objectives                              2021-2022 Performance

             On call personnel will respond to calls within 30 minutes  Personnel responded within 30 minutes of call outs 100%
             after receiving the call 100% of the time.        of the time.


             Replace stolen or damaged signs within 7 days.    100% of signs were replaced within 7 days.

             Repair 75% of the pot holes within 7 days.        100% of potholes were repaired within 7 days.

             Replace broken sidewalks as scheduled.            100% of sidewalks on the schedule were replaced.
             Clean debris from all streets twice a year.       Streets were cleaned twice in FY 2021-2022.

             Respond to weather emergencies (sand streets, set up  Public Services staff were on call to respond to weather
             barricades, etc.) in a timely manner.             emergencies as needed during inclement weather.

             Check storm drains monthly.                       100% of storm drains citywide were checked monthly.
                                                               100% of the 6 drainage channels were cleaned twice in FY
             Clean the six (6) main drainage channels twice a year.
                                                               2021-2022.
             Reduce workers compensation claims by promoting safety  There were a total of 5 workers compensation claims for
             on the job.                                       the Public Services Department.



                                                      2018-2019   2019-2020   2020-2021  2021-2022    2022-2023
             Performance Measures
                                                        Actual      Actual     Actual      Actual      Budget
             STREETS
             Scheduled Sidewalk Repairs Completed        100%       100%        100%        100%        100%
             Linear Feet of Concrete Paving Installed    3,057      2,179       6,481      27,416       5,000

             Pot Holes Repaired                          562         783         147         80          100
             Crack Seal Streets (Linear Feet)           30,000        0           0        11,200      20,000
             DRAINAGE
             Culverts Cleaned (Feet)                     5,100      2,350       4,355       7,313       4,500
             Percent of Storm Drains Checked Monthly (32)  100%     100%        100%        100%        100%
             BUILDING MAINTENANCE
             Building Maintenance Jobs Completed         543         293         326        338          300
             Sprinkler System Maintenance/Repair Jobs     20         19          19          39          20
             OTHER
             Contract Mowing Expenditures              $100,476    $114,159   $114,235     $75,340    $115,000
             Workers Compensation Claims                  3           1           0          5            0