Page 166 - HurstFY23AnnualBudget
P. 166

APPROVED BUDGET FISCAL YEAR 2022-2023






                                                     CITY OF HURST
                 110 GENERAL FUND                      PUBLIC WORKS                           0664 STREETS


               MISSION STATEMENT

               To perform maintenance of streets and traffic control systems in a professional manner that
               will provide safe and efficient movement of traffic on streets and develop and implement
               comprehensive transportation plans that are efficient, safe and environmentally friendly.

               DIVISION DESCRIPTION

               The Street Division is responsible for maintaining 148 miles of paved concrete and asphalt streets
               throughout the City with various types of repair methods such as overlay, seal coat, patching and
               crack sealing.  The Traffic Control Section maintains 41 signals and 7,795 traffic control devices,
               such  as  signs  and  markings.  This  section  also performs traffic  counts for  speed  and  warrant
               studies. This division also responds to all citizen complaints and related street, drainage & traffic
               emergencies that arise.

               PRIOR YEAR RESULTS & ACCOMPLISHMENTS

                   ✓  Overlaid 4.5 lane miles of road surface.
                   ✓  Crack sealed 16 lane miles of roadway surface.
                   ✓  Seal coated 6.1 lane miles of asphalt roadway surface.
                   ✓  Contractors replaced a total of 1,260 feet of curb and gutter, 305 feet of sidewalk, 21

                       driveways, and 1 street valley gutters.
                   ✓  Daily monitoring of the Tactics traffic signal and remote-control system.
                   ✓  Replaced all street name signs in the City with new Hurst Logo and reflective material that
                       were damaged by inclement weather or vandalized.
                   ✓  Monitored traffic signal timing plans throughout the city.
                   ✓  Program, troubleshoot, and maintain 24 School flashers.



               FUTURE INITIATIVES

                   ➢  Overlay 5.5 lane miles of road surface with asphalt.
                   ➢  Crack seal 20 lane miles of roadway surface.

                   ➢  Seal Coat 6.1 lane miles of asphalt roadway surface.
                   ➢  Manage contractors for the Surface Drainage Program replacement of curb and gutter,
                       sidewalk, handicap ramps, driveways, and valley gutters.
                   ➢  Replace faded or damaged signs as needed.






                                                             166
   161   162   163   164   165   166   167   168   169   170   171