110 GENERAL FUND PUBLIC WORKS 0663 ENGINEERING
MISSION STATEMENT
To provide for effective administration of Public Works activities that ensures safe and efficient
roadway systems and to ensure that all City public paving improvements are designed and
constructed in accordance with City regulations and accepted engineering and construction
principles and practices.
DIVISION DESCRIPTION
The Engineering Division of the Public Works Department is responsible for the overall
supervision and administration of streets, drainage, engineering, and construction activities. The
Engineering Division is responsible for reviewing and/or preparing construction plans, issuing
permits, and inspecting new construction of all sidewalks and street systems. The Geographical
Information System (GIS) staff within the Engineering Division prepares and maintains a street
inventory classification system, prepares long-range planning for street improvements, and
maintains and updates all street maps.
PRIOR YEAR RESULTS & ACCOMPLISHMENTS
✓ Received public bids, awarded construction contract, and began construction on West
Pipeline Road Improvements, Phase 3
th
✓ Completed construction on the 46 Year Community Development Block Grant (CDBG)
Project/Livingston Drive Street Improvements.
✓ Completed 2022 Annual Street Rehabilitation Program with Tarrant County and
contractors
✓ Completed construction of 2020 Miscellaneous Street Reconstruction Improvements
th
✓ Began design of 48 Year Community Development Block Grant (CDBG) Project /
Livingston Drive Street Improvements from Willow Street to 629 Livingston Drive
✓ Two Hurst street improvement projects were approved in the 2021 Tarrant County
Transportation Bond Program election in November 2021; West Pipeline Road from
Valley View Branch to Brown Trail and Brown Trail from Queens Way to North City Limits
✓ Review of numerous private development projects.
FUTURE INITIATIVES
➢ Complete construction of Karla Drive Modifications at Hurstview Drive
➢ Complete construction of West Pipeline Road Improvements, Phase 3 from Lorean Branch
bridge to Harrison Lane