Page 173 - Grapevine FY23 Adopted Budget (1)
P. 173

FY 2022-23 APPROVED OPERATING BUDGET
     STORMWATER DRAINAGE UTILITY FUND
     SDUS - OPERATIONS DIVISION SUMMARY
     116-535-001




                                                         2019-20     2020-21     2021-22      2021-22     2022-23
     EXPENDITURES BY OBJECT                               Actual      Actual      Budget     Estimate   Approved

     Personnel                                                  527,598             565,161             575,368             538,998             605,357
     Supplies                                                     23,974               18,574               29,700               21,310               35,700
     Maintenance                                                173,926               89,536             125,000             212,827             125,000
     Services                                                   161,591             213,709             217,580             122,399             217,840
     Insurance                                                  192,370             116,862             185,765             180,574             193,799
     Capital Outlay                                             572,062             580,614             210,000             700,109             210,000
     Transfers                                                  112,000             108,750             107,775               89,008             109,013

     Total                                                   1,763,521          1,693,206          1,451,188          1,865,225          1,496,709


     OBJECTIVES

      - Excavate, re-grade and re-sod 12,000 linear feet of roadside ditches and outfalls.
      - Clean, reset and replace 800 linear feet of reinforced concrete pipe.
      - Inspect and clean 950 restricted underground storm sewer structures.
      - Respond to citizen concerns in a timely manner, reducing the possibility of recurring flood situations.
      - Repair damaged gutter lines reducing the amount of ponding water on curb and gutter streets.
      - Perform required erosion control on above-ground drainage facilities.
      - Clean and remove brush and debris along bridge embankments at road crossings, reducing the possibility of
        damage to bridge structures.



                                                         2019-20     2020-21     2021-22      2021-22     2022-23
     PERFORMANCE INDICATORS                               Actual      Actual      Budget     Estimate   Approved

     Ditch excavation (linear feet)                       12,000      12,500       12,000      11,100      12,000
     Reset reinforced concrete pipe (linear feet)            800         820         800         720         800
     Clean storm sewer structures (ea.)                      950         780         950         750         950
     Clean debris adjacent to bridges (times / year)          4            4           4           4           4
     Sweeping miles                                       17,000      19,500       18,000      19,900      17,000