Page 284 - FortWorthFY23AdoptedBudget
P. 284

Enterprise Funds





            Summary of Services and Performance Measures


                                                           FY21           FY22            FY23
            Key Measures                                  Actual          Actual         Target      Desired Level


            Street Maintenance
               Manage and maintain street infrastructure. Develop and direct street maintenance programs consisting of rehabilitation and pavement
               preservation applications while also providing efficient customer service to internal and external customers.

            Apply 18 lane miles of asphalt overlay on an annual   20.28   15.99            18              18
            basis (new measure for FY 22)
            Repair potholes within 48 hours 95% of the time  100%         100%            95%             95%


            Stormwater Operations
               To manage and maintain stormwater infrastructure. Stormwater services encompass channel restoration, drainage inlet cleaning and
               inspection, vegetation management and mowing.

            Maintain or restore 7 miles of the open channel drainage   7.48  8.12           7              7
            system on an annual basis
            Clean and inspect 6,350 drainage inlets on an annual   6,638  6,507           6,350           6,350
            basis
            Mow 1,480 acres of vegetation in drainage easements   1,456   1,342           1,480          >1480
            on an annual basis


            Transportation Engineering

               To plan, program and coordinate multimodal transportation system development by providing professional engineering services and safety
               program management.

            Retime 1/3 of the City's Signal Intersections annually to
            optimize traffic flow with changing in traffic patterns and   192  301         300            300
            volumes.
            Conversion of residential street lights to LEDs within the   867  443          275            275
            75% MMA.

            Installation of 1,000,000 linear foot of additional   N/A    1,924,901         1M             >1M
            pavement markings and improvement of aging markings.


            Transportation Operations
               To actively operate, plan, and maintain the system of streetlights, signs and traffic signals in a manner that provides safety and achieves
               mobility across all modes of travel.

            Number of instances signals go on flash due to   437           354             300            300
            equipment failure.
            Traffic regulatory sign replacement within 4 hours of   97%    98%            95%             95%
            damage notification 95% of the time






                                                                                                 Page 284 of 623
   279   280   281   282   283   284   285   286   287   288   289