                               CAPITAL IMPROVEMENT PROJECTS - WATER
                                                       2020-2024


              Saginaw Blvd 16" Water Line Phase 2
              Scope        Palomino across Saginaw Blvd to Samson 12" water line
              Method       bore and open-cut with pavement patch
              Project Cost  $1,461,153
              Fiscal Year  Construction began in FY 2020-2021
                           This project will provide additional transmission capacity east of Saginaw Blvd.  This project
              Description  will connect transmission mains from Longhorn Pump Station on the west side of Saginaw
                           Blvd.
              Impact on    There will be an eventual increase in maintenance costs as this is a new water line.  As the
              Operating    infrastructure ages, estimated annual maintenance cost will be $2,863.
              Budget

              Northwest Booster Pump Station
              Scope        increase pressure to the northwest part of the City
              Method
              Project Cost  $432,500
              Fiscal Year  FY 2021-2022
                           The Northwest booster pump station will increase water pressure to the northwest part of the
              Description  City and provide domestic and fire flow capacity.  The pump station will be located a the
                           existing Park Center storage tank site.
              Impact on
              Operating    There will be no additonal operating or maintenance costs as a result of this upgrade.
              Budget

              FM 156 12" Water Line Phase 2
              Scope        450 feet north of Topeka Dr. to Bailey Boswell Rd.
              Method       Open-cut
              Project Cost  $495,000
              Fiscal Year  Future CIP
                           This project will connect transmissions mains in Bailey Boswell with tranmission mains along
              Description  FM156.  The cost estimate assumes construction of the water line before or concurrent with
                           construction of new development.
              Impact on    There will be an eventual increase in maintenance costs as this is a new water line.  As the
              Operating    infrastructure ages, estimated annual maintenance cost will be $2,672.
              Budget
              Condor Trail 12" Water Line
              Scope        Dunster to Bailey Boswell Rd.
              Method       Open-cut
              Project Cost  $420,000
              Fiscal Year  Future CIP
                           This project will connect transmissions mains in Bailey Boswell with Heather Ride Estates and
              Description  provide distribution for future development.  The cost estimate assumes construction of the
                           water line before or concurrent with construction of new development.

              Impact on    There will be an eventual increase in maintenance costs as this is a new water line.  As the
              Operating    infrastructure ages, estimated annual maintenance cost will be $2,868.