CITY OF SAGINAW
                               CAPITAL IMPROVEMENT PROJECTS - WATER
                                                       2020-2024


              West McLeroy 12" Water Line Phase 2
              Scope        Elementary #14 to Old Decatur Rd
              Method       Open-cut with pavement patch
              Project Cost  $325,000
              Fiscal Year  Future CIP
                           This project would provide additional transmission capacity along W. McLeroy Blvd. from
              Description
                           Longhorn Pump Station to the Wayside Elevated Tank.
              Impact on    There will be an eventual increase in maintenance costs as this is a new water line.  As the
              Operating    infrastructure ages, estimated annual maintenance cost will be $2,479.
              Budget

              East McLeroy 12" Water Line
              Scope        S-Curve to FM 156 (Blue Mound Road)
              Method       Open-cut within future ROW
              Project Cost  $680,000
              Fiscal Year  Future CIP
                           This project is the third phase of a three phase project to provide improved transmission along
              Description  East McLeroy Blvd between Saginaw Blvd and FM 156.  This project could be constructed by
                           developers.
              Impact on    There will be an eventual increase in maintenance costs as this is a new water line.  As the
              Operating
              Budget       infrastructure ages, estimated annual maintenance cost will be $2,788.

              Fort Worth Meter Station Upgrade
              Scope        Replace existing meter station and piping with 8,800 gpm facilities
              Method
              Project Cost  $250,000
              Fiscal Year  FY 2021/2022
              Description  This project will be constructed with previously collected water impact fees.
              Impact on
              Operating    There will be no additonal operating or maintenance costs as a result of this upgrade.
              Budget

              Old Decatur Rd 8" Water Line
              Scope        West McLeroy Blvd to Springhill Dr
              Method       Open-cut
              Project Cost  $330,000
              Fiscal Year  Future CIP
                           This project provides a link between West McLeroy Blvd and Park West Subdivision.  This
              Description
                           project could be constructed by developers.
              Impact on    There will be an eventual increase in maintenance costs as this is a new water line.  As the
              Operating
              Budget       infrastructure ages, estimated annual maintenance cost will be $2,556.

              Old Decatur Rd 12" Water Line Phase 1
              Scope        West McLeroy Blvd to First Baptist Church
              Method       Open-cut
              Project Cost  $295,000
              Fiscal Year  Future CIP
                           This project would provide additional transmission capacity along Old Decatur Rd from
              Description  Longhorn Pump Station to the Wayside Elevated Tank.  This project could be constructed by
                           developers.