CITY OF SAGINAW
                        GOALS, OBJECTIVES AND PERFORMANCE MEASURES
                                                       2021-2022


            PUBLIC SERVICES

                        ANNUAL OBJECTIVES                                2020-2021 PERFORMANCE
            On call personnel will respond to calls within 30 minutes  Personnel responded within 30 minutes of call outs 100%
            after receiving the call 100% of the time.       of the time.
            Replace stolen or damaged signs within 7 days.   100% of signs were replaced within 7 days.
            Repair 75% of the pot holes within 7 days.       100% of potholes were repaired within 7 days.
            Replace broken sidewalks as scheduled.           100% of sidewalks on the schedule were replaced.
            Clean debris from all streets twice a year.      Streets were cleaned twice in FY 2020-2021.


            Respond to weather emergencies (sand streets, set up Personnel were on call to respond to weather emergencies
            barricades, etc.) in a timely manner.            as needed during inclement weather.


            Check storm drains monthly.                      100% of storm drains citywide were checked monthly.

            Clean the six (6) main drainage channels twice a year.  100% of the 6 drainage channels were cleaned twice in FY
                                                             2020-2021.
            Reduce workers compensation claims by promoting There were zero workers compensation claims this year.
            safety on the job.





                                                              2017-2018  2018-2019  2019-2020  2020-2021  2021-2022
                        PERFORMANCE MEASURES
                                                              ACTUAL     ACTUAL    ACTUAL    ACTUAL     BUDGET
            STREETS
            Scheduled Sidewalk Repairs Completed                100%      100%      100%       100%      100%
            Linear Feet of Concrete Paving Installed           31,692     3,057     2,179      6,481     3,000
            Pot Holes Repaired                                   53        562       783        147       500
            Crack Seal Streets (Linear Feet)                   30,000    30,000       0         0       30,000
            DRAINAGE
            Culverts Cleaned (Feet)                             3,280     5,100     2,350      4,355     5,000
            Percent of Storm Drains Checked Monthly (32)        100%      100%      100%       100%      100%
            BUILDING MAINTENANCE
            Building Maintenance Jobs Completed                 329        543       293        326       400
            Sprinkler System Maintenance/Repair Jobs             50        20         19        19        30
            OTHER
            Contract Mowing Expenditures                      $126,236  $100,476   $114,159  $114,235  $117,662
            Workers Compensation Claims                          1          3         1          0         0