Page 61 - Project Detail Sheet_AdoptedBook
P. 61

ADOPTED | BUDGET

                                             Street & Sidewalk Capital Projects
                Department                                     Project Title                         Project Number
        Public Works                                 Meadow Oak Drive Reconstruction                      ST2114
                                                      Project Description
        The project consists of the design and reconstruction of approximately 900 linear feet of Meadow Oaks Drive from Dick Lewis to
        Buenos Aires.  The improvements include reconstructing the existing roadway with new full-depth subgrade, limited curb and gutter
        replacement, and new asphalt pavement.  The road will be reconstructed within the existing right-of-way in its current configuration;
        this is not a roadway expansion.






                                                      Project Justification
        A 2020 Capital Program Advisory Committee evalutated the city's infrastructure needs and due to poor road conditions,
        recommended that Meadow Oak Drive be reconstructed.  The committee considered several factors when recommending street
        projects including existing pavement conditions, traffic volumes, maintenance records, and estimated project costs.  Meadow Oak
        Drive is a local or residential street in the City's roadway network.  The current pavement condition rating is 13.6 on a scale of 1-100,
        and has deteriorated to the point that full reconstruction is warranted.

        The 2020 Capital Programs Advisory Committee (CPAC) ranked this project as a high priority. An election was held in November
        2020 to issue General Obligation bonds for street projects, and voters approved issuing the bonds for these projects.










        Project Schedule            Beginning Date   Ending Date        History          Fiscal Year   Amount
        Professional Services                                        Revision              2020-21       $570,000
        Engineering/Design               10/2021         02/2022         Total                           $570,000
        Land/ROW Acquisition
        Construction                     03/2022         09/2022
        Other
        Total Schedule                   10/2021         09/2022
        Sources of Funds             Appr. To Date  2021‐22 Budget  2022‐23 Estimate  2023‐Completion  Total Funding
        General Obligation Bonds         570,000              0                0               0         $570,000
        Certificates of Obligation
        Federal/State Grants
        Reserves
        Sales Tax
        Other
        Total Funding                   $570,000             $0               $0              $0          $570,000

        Project Costs                  To Date    2021‐22 Budget  2022‐23 Estimate   2023‐Completion    Total Cost
        Professional Services
        Engineering/Design                15,000               0               0               0           $15,000
        Land/ROW Acquisition
        Construction                     555,000               0               0               0          $555,000
        Other
        Total Costs                      $570,000             $0              $0              $0          $570,000
        Operating Impact
        Not applicable.


        Fiscal Year                2020‐21       2021‐22      2022‐23       2023‐24       2024‐25     Total Impact
        Amount                           $0            $0            $0            $0            $0           $0