Page 170 - Grapevine FY22 Adopted Budget v2
P. 170

FY 2021-22 APPROVED OPERATING BUDGET
      STORMWATER DRAINAGE UTILITY FUND
      SDUS - OPERATIONS DIVISION SUMMARY
      116-535-001




                                                          2018-19     2019-20    2020-21     2020-21     2021-22
      EXPENDITURES BY OBJECT                               Actual      Actual     Budget     Estimate   Approved

      Personnel                                                 509,937             527,598             544,184             561,866             575,368
      Supplies                                                    21,894               23,974               29,700               18,574               29,700
      Maintenance                                               138,868             173,926             125,000               89,536             125,000
      Services                                                  198,377             161,591             206,792             213,709             217,580
      Insurance                                                 159,824             192,370             120,166             116,862             185,765
      Capital Outlay                                            342,343             572,062             210,000             580,614             210,000
      Transfers                                                 112,059             112,000             108,750             108,386             107,775

      Total                                                  1,483,302          1,763,521          1,344,592          1,689,547          1,451,188


      OBJECTIVES

      - Excavate, re-grade and re-sod 12,000 linear feet of roadside ditches and outfalls.
      - Clean, reset and replace 800 linear feet of reinforced concrete pipe.
      - Inspect and clean 950 restricted underground storm sewer structures.
      - Respond to citizen concerns in a timely manner, reducing the possibility of recurring flood situations.
      - Repair damaged gutter lines reducing the amount of ponding water on curb and gutter streets.
      - Perform required erosion control on above-ground drainage facilities.
      - Clean and remove brush and debris along bridge embankments at road crossings, reducing the possibility of damage to bridge structures.




                                                          2018-19     2019-20    2020-21     2020-21     2021-22
      PERFORMANCE INDICATORS                               Actual      Actual     Budget     Estimate   Approved

      Ditch excavation (linear feet)                       11,490      12,000      13,000     12,500      12,000
      Reset reinforced concrete pipe (linear feet)           510         800         700         820         800
      Clean storm sewer structures (ea.)                     787         950         900         780         950
      Clean debris adjacent to bridges (times / year)          4           4           4           4           4
      Sweeping miles                                       25,056      17,000      18,000     19,500      18,000

























                                                         170
   165   166   167   168   169   170   171   172   173   174   175