dispatch (CAD) system in the 911 center. This needs assessment will be used to prepare for the
               ultimate replacement of the existing system.


               Parks Performance Fund
               The  budget includes several needed improvements  to the BRiCk,  such as  new signage
               throughout the facility ($22,000), replacing worn partitions in the meeting rooms ($11,000),
               replacing the aged lockers in each locker room ($37,000), adding automatic bathroom features

               for towel dispensing, auto flush, and automatic sinks and hand dryers ($29,465). The budget
               also includes $17,570 to refinish the gym floors. Below are some additional enhancements as
               well:


                   •   Russell Farm Art Center The budget includes $9,188 to add a partition for the existing
                       Chesapeake building in order to create an additional classroom.
                   •   4B Parks Performance Fund To provide the required maintenance at the city’s athletic
                       fields and  other grounds, the  budget includes $68,990  for an additional  parks
                       maintenance worker and ground maintenance materials. The budget also recommends

                       $14,900 for  an  outdoor warning system to ensure players are alerted to imminent
                       dangerous weather.
                   •   Hidden Creek Golf Course Fund The current pump station used for course watering and
                       irrigation needs to be replaced. To avoid a failure during the peak heat season, which
                       would cause massive turf  damage and additional costs, $114,250 is included  in the
                       budget for a new pump station.


               Downtown TIF (TIF #2)
               The budget includes $16,800 to replace the crushed granite with synthetic turf in the children’s

               play area at the Mayor Vera Calvin Plaza, providing a safer, maintenance-friendly surface.  To
               improve  efficiencies in maintaining  the old town properties,  a utility cart for caretaker
               transportation is included in the budget at the cost of $19,217.


                Additionally, the budget proposes funding two (2) police officers at the cost of $230,275. These
               officers will be primarily assigned to the downtown area to increase safety.


               Cash Funding Capital Improvements
               The CIP program for FY 2021-22 is $34.0 million. To reduce debt service costs, $1.5 million in
               cash funding is budgeted for a new fire ladder truck, and $7 million in cash funding for CIP
               projects is planned over the next 5 years. The budget also contemplates a bond program of $88
               million for streets and public safety. Bonds will be sold over the next several years, and the city