                            GOALS, OBJECTIVES AND PERFORMANCE MEASURES
                                                        2020-2021

            WATER & WASTEWATER

                City             FY 2019-2020                 FY 2019-2020                  FY 2020-2021
              Strategy         Department Goal           Department Achievement            Department Goal


                        Maintain reserves at 25% of the Enterprise Reserves were maintained over 25% of Maintain reserves at 25% of the Enterprise
                        Fund operating budget.       the Enterprise Fund operating budget.  Fund operating budget.






                        Maintain Moody's rating of Aa3 and  The bond ratings were maintained.  Maintain Moody's rating of Aa3 and
                        Standard and Poor's rating of AA/Stable.                   Standard and Poor's rating of AA/Stable.

              Maintain a
            financially sound
             City providing                          Design has been completed for the Construct the Northwest Booster Pump
              superior   Construct  the Saginaw Boulevard 16"  Saginaw Boulevard 16" water line phase 2 Station and the Saginaw Boulevard 16"
              services  water line phase 2.          project.                      water line phase 2.


                                                        Construction was completed on the
                        Complete construction of the Fairmont 12"   Fairmont 12" sewer rehabilitation phase1   Complete the Resiliency Study and
                            sewer rehabilitation phase 1.                          Emergency Response Plan by June 2021.
                                                                 project.



                        Complete miscellaneous projects identified   The phase 3 inflow/infiltration remediation   Complete replacement of water meters
                         during phase 3 of the inflow/infiltration   projects were completed.  with those using cellular technology.
                                    study.


                                                  LONG TERM OBJECTIVES

            Implement a leak detection/water loss program on our water system.

            Replace water lines as designated on the Capital Improvements Plan.

            Perform random water meter accuracy tests throughout the system.

            Replace wastewater lines as designated on the Capital Improvements Plan.

            Inspect, reseal and/or replace, as necessary, all wastewater manholes.

            Maintain current certifications through continuing education credits and seek new certifications.

            Promote the “Clean It Like You Mean It” program to rid the City of hazardous waste, tires, etc.