Street & Sidewalk Capital Projects
Project Name Project Description
Meadow Lakes Drive & Rufe The area along Rufe Snow, south of LP 820, is severely congested with 7 different ingress/egress points within a 700
Snow Drive Intersection - foot span. The project proposes the conversion of the current Rufe Snow/Meadow Lakes 3 way signalized intersection
Continuing Project into a 4 way signalized intersection that would be a separate but complimentary project to ST0102 - Rufe Snow Drive
Street & Utility Improvements, which calls for a raised median along Rufe Snow. This project would extend Meadow
Lakes east of Rufe Snow, connecting to the commercial area along LP 820. The project would also eliminate 3 of the 7
ingress/egress points within the 700 foot span.
Northeast Parkway / Davis Blvd. This project consists of engineering and construction of a new traffic signal at the intersection of Davis Boulevard and
Traffic Signal - Continuing Northeast Parkway. The scope includes paving and signal improvements.
Project
Northeast Parkway Extension - This project consists of constructing an extension of Northeast Parkway west of Davis Boulevard towards Smithfield
Continuing Project Road. The new pavement will intersect with Davis at a proposed traffic signal, and will include a roundabout midway
between Davis and Smithfield to accomodate a future Snider Street connection and provide traffic calming. The project
will be constructed in two phases, with the Davis connection through the roundabout included in Phase I, and the
connection to Smithfield in Phase II after the exisitng elementary school is demolished in 2021.
Preventive Street Maintenance This is the annual program where funds are dedicated to enhance the city's efforts for preventive maintenance of city
(2019) - Continuing Project streets. The scope of this project provides crack sealing for approximately 15-25 streets, slurry seal for 15-25 streets
and a 2 inch asphalt overlay for 12-15 streets. In addition to these three maintenance methods, staff will be searching for
new preventive procedures to consider in the future.
Preventive Street Maintenance This is the annual program where funds are dedicated to enhance the city's efforts for preventive maintenance of city
(2020) - Continuing Project streets. The scope of this project provides crack sealing for approximately 15-25 streets, slurry seal for 15-25 streets
and a 2 inch asphalt overlay for 12-15 streets. In addition to these three maintenance methods, staff will be searching for
new preventive procedures to consider in the future.
Preventive Street Maintenance This is the annual program where funds are dedicated to enhance the city's efforts for preventive maintenance of city
(2021) - New Project streets. The scope of this project provides crack sealing for approximately 15-25 streets, slurry seal for 15-25 streets,
asphalt microsurface for 5-10 streets and a 2 inch asphalt overlay for 12-15 streets. In addition to these four
maintenance methods we have incorporated concrete crack sealing for 15-25 streets and concrete street partial
pavement replacement for 10-20 streets. The Pavement Assessment report from 2019 will provide the
recommendations the list of streets for this year's program.