CAPITAL IMPROVEMENT PROGRAM OVERVIEW




          General debt service fund balances will be used as needed to supplement debt payments and
            issuance costs. Debt capacity will be calculated annually to ensure adequate revenues for debt
            payments for both existing issues as well as prospective issues.

          Alternative sources of funding, including grants, will be sought as available and when beneficial
            in lieu of or in conjunction with other funding sources for capital projects.

                                          CIP Impact on the Operating Budget

        During the development of the CIP budget, city staff works to identify and plan for impacts to the
        operating budget from changes  in infrastructure and major equipment purchases approved in the
        Adopted CIP  budget. The  following  information describes the impact that projects included in the
        2020/2021 CIP, and related debt service, are expected to have on the operating budget.

        Street & Sidewalk Projects

          The  Preventive  Street Maintenance Project and Preventive Street Maintenance Multi-Year
            projects  provide  for  crack  sealing, slurry sealing, and asphalt or concrete overlay of selected
            streets throughout the City. This annual program improves street conditions,  reduces  typical
            roadway maintenance costs, and delays more costly street reconstruction. The 2020/2021 budget
            allocates $1,000,000 for funding for slurry seal for 15-25 streets, crack seal for 15-25 streets, and
            asphalt overlay for 12-15 streets.

          In 2020/2021, the City will complete rehabilitation and  replacement  of  approximately  50,000
            square feet of city sidewalks. These sidewalks have been determined to be in a deteriorated state
            in residential and high pedestrian areas. This program improves the sidewalk conditions, reduces
            maintenance cost and delays the need for costlier reconstruction.

        Drainage Projects

          Street  Drainage  Improvements  will  be  performed  in multiple locations in the City during
            2020/2021 to help restore positive drainage at some of the 159 locations identified in the City.
            This  project  will  help  to  remove  standing water problems, which contribute to the premature
            deterioration of asphalt on City streets.


        Utility Projects

          In 2020/2021, the City will be continuing efforts to replace aging water and sewer infrastructure at
            several locations for the purpose of maintaining high standards for water quality and increasing
            system capacity.  Many of these locations due to age require significant maintenance costs which
            will be greatly reduced through these replacements.

          Sewer Manhole Replacement and Rehabilitation efforts will continue in 2020/2021 to replace and
            restore 150 of the 660 manholes currently in need of replacement.  This project helps to reduce
            overall sewer treatment costs to the city by reducing the inflow infiltration from rainwater into the
            sewer system.