Page 379 - Hurst Budget FY21
P. 379

STORM DRAINAGE UTILITY FUND

                                                    FUNDED PROJECTS



                                                                                                 Operating Impact
                       Project Description           Project Justification      Status 9/30/20
                                                                                                    9/30/20
              This project consists of repairs to joints, top   This project is necessary to maintain our   This project is currently in   O&M impact due to
              surface cracks, substructure point repairs,   bridges so we can provide safe roadways  the design phase.  reduced maintenance
              spalled surface concrete, and the traffic   for the driving public and our emergency   costs with repair of
              railings.                       vehicles.                                        drainage ditch.



              This project consists of lining an existing   This project will repair some corroded   This project is currently in   O&M impact due to
              corrugated metal storm drain pipe with a cast- spots in the flow line of the arch pipe and   the planning phase.  reduced maintenance
              in-place pipe material.  Some access to the   extend the life for another 50 years plus.    costs with repair of
              pipe will be required to install the lining.  This drainage pipe is carrying considerable   drainage ditch.
                                              rainfall runoff from the residential and
                                              commercial areas to the north and west of
                                              the State Highway 26 / Grapevine Highway
                                              and Hurstview / Norwood Drive
                                              intersection. Maintaining this storm drain is
                                              critical for the commercial/retail property
                                              on Grapevine Highway in this area.


              This project consists of repairs to joints,                   This project is currently in   TBD
              substructure point repairs, spalled surface   This project is necessary to improve traffic  the planning phase.
              concrete, and the concrete railings.  flow along Pipeline Road. This project will
                                              include the results of the redevelopment
                                              efforts and zoning overlay for the area east
                                              of Precinct Line Road.  Tarrant County has
                                              pledged to participate in 50% of the
                                              construction cost.
              The plans are to remove and replace what   Recent heavy rains have contributed to the  This project is currently in   TBD
              channel liner is damaged as well as fortify the  Valley View Branch concrete channel liner  the design phase.
              toe of slope on a portion of the channel.  A   slopes cracking and heaving upstream of
              portion of the flume which comes in from the   East Pipeline Road to Plaza Boulevard.
              east will be widen and reconnected.  This stretch of concrete channel is over 40
                                              years old.  The failures are severe enough
                                              to warrant quick evaluation of the failures
                                              and design of repairs.  The longer the
                                              failures are left without repair there is a
                                              possibility for future damage to the
                                              adjacent channel liner.  Staff has taken
                                              action to temporarily mitigate the situation
                                              while waiting for the repairs to be bid and
                                              awarded.