                          CAPITAL IMPROVEMENT PROJECTS - WASTEWATER
                                                        2019-2023




             Infiltration/Inflow (I/I) Study Phase 1 and related repairs
             Scope        Little Fossil Creek Basin
             Method       Study
             Project Cost $250,000
             Fiscal Year  Project continues in FY 2019-2020
                          A study, including smoke testing and manhole inspections, was performed on a selected area
                          of the Little Fossil Creek Basin in 2016.  The study identified numerous sections of pipe for
             Description  further analysis.  The continuation of this study will include television inspection of
                          approximately 14,500 LF of pipe. This study will recommend projects to address the most
                          critical inflow/infiltration problem areas.
             Impact on
             Operating    The on the operating budget will be determined when the projects are identified.
             Budget

             Infiltration/Inflow (I/I) Study Phase 2
             Scope        West Cement Creek Basin
             Method       Study
             Project Cost $95,000
             Fiscal Year  FY 2018-2019
                          This study will include flow monitoring and identification of problem sections.  This study will
             Description  include smoke testing and television inspection of selected sections.  This study will
                          recommend projects to address the most critical inflow/infiltration problem areas.
             Impact on
             Operating    This is a study; there will be no impact on the operating budget until projects are identified.
             Budget

             Fairmont 12" Sanitary Sewer Replacement
             Scope        Southern Ave. to Sansom Blvd.
             Method       Bore
             Project Cost $2,778,500
             Fiscal Year  Construction to begin in FY 2019-2020
                          This line was identified for replacement due to pipeline deterioration and inflow/infiltration
             Description  problems.  Replacing the new line by bore will minimize disturbance to railroad and industrial
                          activities.
             Impact on    Reduced operating costs are expected upon completion of this project.  Any savings in
             Operating    maintenance costs will be allocated to other locations in the wastewater system.  As the
             Budget       infrastructure ages, estimated maintenance cost will be $2,564.

             Infiltration/Inflow (I/I) Study Phase 3
             Scope        East Cement Creek Basin
             Method       Study
             Project Cost $101,000
             Fiscal Year  FY 2020-2021
                          This study will include flow monitoring and identification of problem sections.  It will also include
             Description  smoke testing and television inspection of selected sections.  The study will recommend
                          projects to address the most critical inflow/infiltration areas.
             Impact on
             Operating    This is a study; there will be no impact on the operating budget until projects are identified.
             Budget