Utility Capital Projects
        Department                                             Project Title                         Project Number
        Public Works                                  Large Valve Replacement Project                     UT1901
        Project Description
        The Large Water Valve Replacement Project encompassed the replacement of two, 24 inch valves, a 12 inch valve, and the
        installation of a 16 inch valve.  The 24 inch valve replacements are located at the intersections of Hightower and Smithfield Road
        and Hightower and Davis Boulevard.  The 12 inch valve replacement is located at Davis Boulevard and Odell Street.  The
        installation of the 16 inch valve will be near the intersection of Glenview Drive and Dawn Drive.






        Project Justification
        The replacement and installation of these large water valves will improve circulation and enhance water quality.  The completed
        project will reduce the number of residential and business connections affected by water outages, decrease the time water is off for
        repair, and greatly reduce the amount of water loss during water main breaks or construction mishaps.  These valves are located on
        large mains and are buried deep in the ground.  These are not typically valve replacements and an outside contractor with
        experience replacing valves of this size and depth will be used.














        Project Schedule        Beginning Date  Ending Date  History       Fiscal Year   Amount
        Professional Services                             Adopted Budget    2018-19        $95,000
        Engineering/Design                                Total                            $95,000
        Land/ROW Acquisition
        Construction               10/2018      09/2019
        Other
        Total Schedule             10/2018      09/2019
        Sources of Funds          To Date    2019-20 Budget 2020-21 Estimate  2021-Completion  Total Funding
        General Obligation Bonds
        Certificates of Obligation    95,000            0             0             0       $95,000
        Federal/State Grants
        Reserves
        Sales Tax
        Other
        Total Funding                 $95,000          $0            $0            $0       $95,000
        Project Costs             To Date    2019-20 Budget 2020-21 Estimate  2021-Completion  Total Cost
        Professional Services
        Engineering/Design
        Land/ROW Acquisition
        Construction                  95,000            0             0             0       $95,000
        Other
        Total Costs                   $95,000          $0            $0            $0       $95,000
        Operating Impact
        No operating impact is anticipated.


        Fiscal Year                2019-20       2020-21      2021-22       2022-23       2023-24     Total Impact
        Amount                            $0           $0            $0            $0            $0            $0
        Total Operating Impact            $0           $0            $0            $0            $0            $0




                                                             121