Page 179 - Keller FY20 Approved Budget
P. 179

PUBLIC WORKS DEPARTMENT
                           STREET MAINTENANCE DIVISION (100-500-51)




            DEPARTMENT DESCRIPTION:
            The Street Maintenance Division of the Public Works Department is responsible for the maintenance and repair of all publically
            owned streets and sidewalks. This includes the repair and maintenance of concrete and asphalt pavements, sidewalks, curb and
            gutter, signs, pavement markings, traffic signals, school zones, and guardrails.


            DEPARTMENT/DIVISION GOALS:
            1. Continuously review processes to determine operational improvement and maintenance cost reduction opportunities.
            2. Respond to emergency repair calls (Stop and Yield signs, Traffic and School Zone signals, blocked roads…) within 24 hrs.
            3. Manage the sidewalk program with a goal to reduce backlog needs to a year or less.
            4. Sweep public streets as required by the City's MS4 permit.
            5. Leverage technology to track and manage all work activities.
            6. Leverage county partnerships to maximize roadway maintenance activities.
            7. Manage the Pavement Management System and its associated recommended annual maintenance schedule.


            SERVICE LEVEL ANALYSIS:
                                                                                          FY 2019-20
                                                  FY 2017-18    FY 2018-19   FY 2018-19    Adopted
            SERVICES PROVIDED                       Actual        Budget      YE Proj.     Budget
            Total lane-miles of roadway maintained   447.1         484          450          455
            Curb miles of street sweeping completed  622           1,000        625         1,000
            Acres of contracted right of way mowing  240           240          240          240
            Acres of City mowed right of way         6.00          6.00         6.00         6.00
            Linear feet of sidewalks repaired        5,735         4,000       5,000        5,000
            Lane miles of pavement crack-sealed       7             50           10          14
            Tons of asphalt used                     4,372         3,500       4,500        4,500

            PERFORMANCE INDICATORS
            % of streets swept at least 3x per year   90           100           90          100
            % of right of way mowed at least 6x per year  100      100          100          100
            % of sidewalk backlog more than 30 days   90            25           80          80
            % of pavement addressed per the Pavement
            Management System                          -           100           77          100
            % of sidewalk maintained on schedule       -           100           -           100
            % of roadway system above 70 on the
            Pavement Condition Index                   -            70          79.8         80