Page 391 - Hurst FY20 Approved Budget
P. 391

CITY OF HURST


           STORM DRAINAGE FUND                      PUBLIC WORKS                        0664 DRAINAGE


                GOALS, OBJECTIVES & PERFORMANCE MEASURES

                Council Priorities:  Infrastructure

                Goals:

                    •  Identify drainage issues for Engineering Division.
                    •  Maintain the drainage systems in a condition for efficient and safe passage of storm water.
                    •  Control vegetation in channels by mowing or through chemical application.
                    •  Maintain Surface Drainage Program which includes curb and gutter, driveways, sidewalks
                       and valley gutters.


                Objectives:

                    •  Street sweeping.
                         10 + Years Long Term

                    •  Manage the surface drainage program.
                         3-10 Years Intermediate Term

                    •  Vegetation control.
                         3-10 Years Intermediate Term

                    •  Inspections and repairs of channels and bridges.
                         0-3 Years Short Term

                    •  Inlet inspections and decals.
                         10 + Years Long Term

                    •  Implementation of the integrated storm water management (iSWM) plan.
                         10 + Years Long Term

                    •  Maintain the drainage system and clear obstructions before and after rain events.
                         10 + Years Long Term
















                                                             375





                                                             225
   386   387   388   389   390   391   392   393   394   395   396