Page 391 - Hurst FY20 Approved Budget
P. 391
CITY OF HURST
STORM DRAINAGE FUND PUBLIC WORKS 0664 DRAINAGE
GOALS, OBJECTIVES & PERFORMANCE MEASURES
Council Priorities: Infrastructure
Goals:
• Identify drainage issues for Engineering Division.
• Maintain the drainage systems in a condition for efficient and safe passage of storm water.
• Control vegetation in channels by mowing or through chemical application.
• Maintain Surface Drainage Program which includes curb and gutter, driveways, sidewalks
and valley gutters.
Objectives:
• Street sweeping.
10 + Years Long Term
• Manage the surface drainage program.
3-10 Years Intermediate Term
• Vegetation control.
3-10 Years Intermediate Term
• Inspections and repairs of channels and bridges.
0-3 Years Short Term
• Inlet inspections and decals.
10 + Years Long Term
• Implementation of the integrated storm water management (iSWM) plan.
10 + Years Long Term
• Maintain the drainage system and clear obstructions before and after rain events.
10 + Years Long Term
375
225