CITY OF HURST
STORM DRAINAGE FUND PUBLIC WORKS 0663 ENGINEERING
MISSION STATEMENT
To provide for effective administration of Public Works activities that ensures safe and efficient
storm drain systems and to ensure that all City public drainage improvements are designed and
constructed in accordance with City regulations and accepted engineering and construction
principles and practices.
DIVISION DESCRIPTION
The Engineering Division of the Public Works Department is responsible for the overall
engineering and construction of streets and drainage activities. The Engineering Division is
responsible for reviewing and/or preparing construction plans, issuing permits, and inspecting
new construction of all street and drainage systems. The Engineering Division also prepares long
range planning for street and drainage improvements. The GIS staff within the Engineering
Division prepares and maintains a storm drain system inventory and updates all storm sewer
maps.
PRIOR YEAR RESULTS & ACCOMPLISHMENTS
Began Construction of Cimarron Trail Drainage Improvements.
Completed Design of Hurstview Drive Bridge Repairs over Lorean Branch
Complete Design and Begin Construction of Valley View Branch Channel Repairs
Complete City Wide Master Drainage Plan, Phase 3 – Walker Branch
FUTURE INITIATIVES
Complete Construction of Cimarron Trail Drainage Improvements
Complete Construction of Hurstview Drive Bridge Repairs over Lorean Branch
Complete Construction of Valley View Branch Channel Repairs
Design Norwood North Storm Drain Arch Pipe Rehabilitation
Design Bedford Court East Bridge over Valley View Branch Repairs
Design of Pipeline Road Phase 4 (storm drain portion)