CITY OF HURST


           STORM DRAINAGE FUND                      PUBLIC WORKS                      0663 ENGINEERING


                MISSION STATEMENT

                To provide for effective administration of Public Works activities that ensures safe and efficient
                storm drain systems and to ensure that all City public drainage improvements are designed and
                constructed  in  accordance  with  City  regulations  and  accepted  engineering  and  construction
                principles and practices.


                DIVISION DESCRIPTION

                The  Engineering  Division  of  the  Public  Works  Department  is  responsible  for  the  overall
                engineering  and  construction  of  streets  and  drainage  activities.    The  Engineering  Division  is
                responsible for reviewing and/or preparing construction plans, issuing permits, and inspecting
                new construction of all street and drainage systems. The Engineering Division also prepares long
                range  planning  for  street  and  drainage  improvements.    The  GIS  staff  within  the  Engineering
                Division prepares and maintains a storm drain system inventory and updates all storm sewer
                maps.



                PRIOR YEAR RESULTS & ACCOMPLISHMENTS

                      Began Construction of Cimarron Trail Drainage Improvements.
                      Completed Design of Hurstview Drive Bridge Repairs over Lorean Branch
                      Complete Design and Begin Construction of Valley View Branch Channel Repairs
                      Complete City Wide Master Drainage Plan, Phase 3 – Walker Branch



                FUTURE INITIATIVES

                      Complete Construction of Cimarron Trail Drainage Improvements
                      Complete Construction of Hurstview Drive Bridge Repairs over Lorean Branch
                      Complete Construction of Valley View Branch Channel Repairs
                      Design Norwood North Storm Drain Arch Pipe Rehabilitation
                      Design Bedford Court East Bridge over Valley View Branch Repairs
                      Design of Pipeline Road Phase 4 (storm drain portion)