Page 203 - Grapevine FY20 Approved Budget
P. 203

Public Works - Stormwater Drainage
                                                      116-535-001




               Expenditures by                     2016-17     2017-18    2018-19     2018-19    2019-20
               Major Object                         Actual      Actual     Budget    Estimate  Approved

               Personnel Services                   492,963    533,061    549,651     487,809    559,846
               Supplies                              15,648     19,676      29,700     21,894      29,700
               Maintenance                           89,951    115,988    125,000     138,868    125,000
               Services                             257,579    313,124    234,655     176,853    204,525
               Insurance                                 0           0    162,006     159,824    162,060
               Capital Outlay                        30,151     62,911    210,000     202,556    210,000
               Transfers                            257,127    109,407    108,300      88,442    112,000

               Total                              1,143,420  1,154,167   1,419,312  1,276,246   1,403,131





               Objectives

                - Excavate, re-grade and re-sod 12,000 linear feet of roadside ditches and outfalls.
                - Clean, reset and replace 800 linear feet of reinforced concrete pipe.

                - Inspect and clean 950 restricted underground storm sewer structures.
                - Respond to citizen concerns in a timely manner, reducing the possibility of recurring flood
                       i
                   i
                - Repair damaged gutter lines reducing the amount of ponding water on curb and gutter streets.
                - Perform required erosion control on above-ground drainage facilities.
                - Clean and remove brush and debris along bridge embankments at road crossings, reducing the
                  possibility of damage to bridge structures.





                                                   2016-17     2017-18    2018-19     2018-19    2019-20
               Performance Indicators               Actual      Actual     Budget    Estimate  Approved

               Ditch excavation (linear feet)        11,047     11,490      12,000     12,000      13,000
               Reset reinforced concrete pipe              1,305   510        800         800        700
               (linear feet)
               Clean storm sewer structures (ea)       953         787        950         950        900
               Clean debris adjacent to bridges                 4    4          4           4          4
               (times / year)
               Sweeping miles                        21,524     25,056      17,000     17,000      18,000












                                                          195
   198   199   200   201   202   203   204   205   206   207   208