Page 170 - FY2020Colleyville
P. 170

certain that improvements meet Colleyville Development Standards. These standard
                       practices ensure the delivery of clean, pure water to citizens.

                   2.  Ensure  wastewater is  managed in a safe and efficient manner for the sake of
                       maintaining the public health.

                       3.2 - Ensure regular replacement of water and wastewater facilities

                       Wastewater collection provides environmentally-friendly conveyance of our
                       wastewater to the treatment plant operated by the Trinity River Authority.  Maintaining
                       and operating existing infrastructure to reduce the effect of our  waste material on
                       health and the environment is crucial. The Wastewater division takes an aggressive
                       approach  to this responsibility through a proactive monitoring and  preventive
                       maintenance program. These operations include cleaning and inspecting 180 miles of
                       sewer mains in addition to 2,686 manholes and
                       three (3) lift stations.  The construction of new
                       public infrastructure is inspected by  the
                       Engineering Division to ensure that it meets all
                       necessary specifications. This  comprehensive
                       program serves the public by maintaining a safe
                       and healthy environment.



                                   Performance Measures & Vital Statistics

                                                                                                    FY 2020
                     Performance Measures       FY 2015    FY 2016    FY 2017    FY 2018   FY 2019   Target



                   Percentage of water valves     1%        15%        34%        11%       14%       ≥5
                           exercised
                    Meter reading accuracy       98%        99%        98%        98%       97%      ≥98%


                   Scheduled wastewater line     91%        94%        93%        96%       98%      ≥95%
                      cleanings completed

                                                                                                    FY 2020
                       Vital Statistics     FY 2015    FY 2016     FY 2017    FY 2018    FY 2019
                                                                                                    Estimate

                      Water loss ratio       2.5%        2.5%       3.0%       2.9%        N/A        3.0%
                  Percentage of monthly
                   water samples testing     98%        100%        100%       100%       100%       100%
                   negative for coliform
                         bacteria








                                                                                                          168
   165   166   167   168   169   170   171   172   173   174   175