Page 181 - Saginaw FY19 Annual Budget
P. 181
£ ¤ 1
287
Ú
15 Bailey Boswell Road Ú Ú
Ú
11 2 156
Ú Ú Ú Ú Ú 3 FM
Ú
Complete
Ú Ú
Ú 18
16
10 Complete
Ú
9 Saginaw
Ú
Road 12
Blvd
ÚÚ Ú
Decatur Ú Ú
Old 8 8 19 Ú
4
Ú Ú E McLeroy Blvd
Ú
6 Ú Ú
Ú ÚÚ Ú
W McLeroy Blvd
Ú
5
156
FM
7
14 13
Ú Ú Ú Ú Ú
Longhorn Road E Industrial Ave
£ ¤
287
Matchline
Matchline
2016-2021 Street CIP
1) Bailey Boswell Ph. 2 & 3 Reconstruction
2) Bailey Boswell Overpass
3) Basswood Blvd.
4) E. McLeroy Blvd. Ph. 2 Reconstruction
5) W. McLeroy Blvd. Ph. 3 Reconstruction
6) W. McLeroy Blvd. Ph. 4 Reconstruction
7) Knowles Dr. Ph. 1 Reconstruction to 3 Lanes
8) Knowles Dr. Ph. 2A Reconstruction to 3 Lanes
9) Knowles Dr. Ph. 2B Reconstruction to 3 Lanes and Drainage Improvements
10) Knowles Dr. Ph. 3 Reconstruction to 3 Lanes
11) Signal at Knowles & Bailey Boswell
12) W.J. Boaz
13) Industrial Bvd. Reconstruction Phase 1
14) Industrial Bvd. Reconstruction Phase 2
15) Old Decatur Road North
16) Bailey Boswell to McLeroy North-South Collector
17) Railroad Quiet Zone Implementation (Location TBD)
18) Heather Ridge Pkwy. Extension
19) E. McLeroy Blvd. (Western Center Extension)
Map Disclaimer
This map product is for informational
City of Saginaw, Texas purposes and may not have been
2018 Annual Budget Retreat prepared for or be suitable for legal,
engineering, or surveying purposes.
STREET CIP It does not represent an on-the-ground
S
survey and represents only the
approximate relative location of property
August 2018
177 boundaries.