Page 14 - Saginaw FY19 Annual Budget
P. 14

CITY OF SAGINAW
                                                 STRATEGIC PLAN

                                                       2018-2019

               City             FY 2016-2017                  FY 2016-2017                   FY 2017-2018
              Strategy         Department Goal            Department Achievement           Department Goal
                                                     Community  Services  Replaced  five Community Services Replace ellipticals
                                                     exercise bikes, repaired/replaced window at the Rec Ctr. Resurface a portion of
                                                     blinds, and refinished racquetball court flooring and refurbish the large slide at the
                                                     floor at the Recreation Center. Replaced Aquatics Ctr.
                         Maintain and upgrade City Facilities  the vacuum, a shade structure, and
                                                     refinished play structures at the Aquatic  Parks Complete Park and Playground Site
                                                     Center.                       Analysis Plan.
                                                     Parks Improved and expanded parking at Police replace interview room recording
                                                     Willow Creek Park.            equipment.
                                                     Public Services continued construction Public Services complete construction on
                                                     on East Bailey Boswell phases 2 and 3.  East Bailey Boswell phases 2 and 3.
                                                                                   Public Services reconstruct Anderson
                          Maintain and upgrade City Streets  Public Services completed rehabilitation
                                                     on sections of Palomino, Bluebonnet,  from Saginaw Blvd to Bluebonnet. Spot
                                                                                   repairs along Industrial, McLeroy, Topeka
                                                     Belmont, and spot repairs along Knowles.  Dr, Mockingbird Dr, Whistle Stop Dr, and
                                                     Crack sealed 30,000 feet of streets.
            Maintain and                                                           Carriage Lane.
             upgrade the                             Water/Wastewater      completed
               City's                                construction of the South Hampshire 16"  Water/Wastewater complete design of the
            infrastructure                           water line.                   Saginaw Boulevard 16" water line phase 2.
              to assure
               quality                               Water/Wastewater  repaired  leak  and
              services  Maintain and upgrade the City's Water   resurfaced the Park Center overhead
                                   System            storage tank.                    Water/Wastewater complete utility
                                                                                    relocation for the FM 156 TexDOT road
                                                     Water/Wastewater continue construction   widening project.
                                                      of the Saginaw Boulevard 12" water line
                                                              Phase 2 project.
                                                                                   Water/Wastewater complete construction
                                                                                   of the Fairmont 12" sewer rehabilitation
                                                      Water/Wastewater completed design of   phase 1.
                          Maintain and upgrade the City's   the Fairmont 12" sewer rehabilitation phase
                              Wastewater System
                                                                   1.              Water/Wastewater        complete
                                                                                   miscellaneous projects identified in Phase
                                                                                   1 of inflow/infiltration study.
                                                     Public Services cleaned 3,280 feet of Public Services begin design for Phases
                      Maintain and upgrade the City's Drainage  culverts, 2,500 feet of ditches and creeks, 2 and 3 of the East Cement Creek
                      System
                                                     and regraded 650 feet of drainage ditches. drainage project.
                                                     Administrative  Services  adopted  a
                      Administrative Services adopt a property  property tax rate $0.471800 that generated  Administrative Services adopt a property
                      tax rate that maintains current service and  the property tax revenue sufficient to fund  tax rate that maintains current service and
                      staffing levels and covers voter approved  operations,  as  well as, debt service  staffing levels and covers voter approved
                      debt service requirements.                                   debt service requirements.
                                                     payments.
                      Administrative Services continue to offer Administrative  Services  raised  the Administrative Services continue to offer
              Maintain
             service and   competitive salary and benefits in order to TMRS  contribution  rate to be more competitive salary and benefits in order to
            staffing levels  hire and retain quality employees in all consistent with surrounding and similar hire and retain quality employees in all
                      departments.                   sized cities.                 departments.
                                                     Administrative  Services  Negotiated
                      Administrative Services control the cost                     Administrative Services control the cost
                                                                              rates,
                      of employee health insurance by continuing  medical  and  dental  insurance medical  of employee health insurance by continuing
                                                     resulting in a 1% decrease in
                      to take competitive bids for these services  insurance and a two year price guarantee  to take competitive bids for these services
                      and evaluate plan options.                                   and evaluate plan options.
                                                     for dental insurance.



                                                             14