Aquatic Park Capital Projects
Project Name Project Description
General Facility Costs for additional construction such as drainage improvements, miscellaneous building improvements or capital
Improvements (2018) - acquisitions are calculated and submitted on an annual basis. These costs also include safety improvements to/for the
Continuing Project facility that are identified during the current operating season. The project funds unforeseen equipment failures and
emergency items necessary to operate the park. Projects in the past have included switchgear for the Green Extreme, ADA
updates, replacement motors, drainage improvements, concrete repair and patching and resurfacing of the Splashatory.
General Facility This project consists of costs for annual general facility improvements such as drainage improvements, miscellaneous
Improvements (2019) - building improvements, capital acquisitions and any safety improvements or emergency repairs for the facility that are
New Project identified during the operating season. Projects in the past have included switchgear for the Green Extreme, ADA updates,
replacement motors, drainage improvements, concrete repair and patching and resurfacing of the Splashatory.
Main Filtration This project is for the replacement of the two main filters that are responsible for filtering the water in the Endless River,
Replacement - Wave Pool, Stream and both slide tower complexes located by the Endless River. The current filters were installed when
Continuing Project the park opened in 1995. There are two filters and each filter is a Whitten high rate sand filter model #2U-6C-108"H. Each
filter is 12' 6" high, 9' wide, and each holds 35 tons of sand as its filter media. This replacement is necessary due age of the
filters.