                     Project Description                 Project Justification        Status 9/30/18      9/30/18


         Description:  The purpose of the funding is to replace   Depreciated Item, scheduled for replacement in   Project to begin in early   O&M impact for
         the digital storage systems that serve the PD and CH   FY2017-18. Funds have been identified in the IT   2019  maintenance fees.
         locations.                            Fund.
                                               This project is necessary to improve traffic flow   Construction began during  O&M impact due to
         This project will widen Pipeline Road from Precinct Line  along Pipeline Road. This project will include the   the 2016-2017 budget   reduced maintenance
         Road to Hurstview Drive. Many of the intersections   results of the redevelopment efforts and zoning   year and is estimated to   costs with construction
         have been widened in preparation for this project.  overlay for the area east of Precinct Line Road.    be complete somtime   of new street.
                                               Tarrant County has pledged to participate in 50%  during fiscal year 2018-
                                               of the construction cost.         2019.
         The sanitary sewer replacement project involves the   The Wastewater Collection Division has identified  This project is in the   O&M impact due to
         replacement or rehabilitation of deteriorating or   these mains to allow excessive inflow and   design phase.    decreased cost in
         undersized 15" sanitary sewer trunk mains with a 24"   infiltration (I&I) during rain events, causing   Construction is scheduled  maintenance of water
         trunk main.                           customer sewer backups.           to begin during fiscal year  lines.
                                                                                 2018-2019.
         Staff is identifying areas that could sustain a dog park   The City of Hurst will finally have a dog park for the This project has not yet   TBD
         with the following amenities: black vinyl coated chain-  benefit and recreation of its citizens.  The dog park  begun.
         link fencing with mow strips; concrete sidewalks   will be located in an existing park, negating the
         connecting dog park to trail system; water fountains   need for additional land, parking, utilities, etc.
         with pet fountain attachments and one Pet Comfort   Without this funding, the City of Hurst will remain
         Station; benches for patrons; and Doggy Depot   one of the few cities in the area without a dog park.
         Stations.



         Staff is identifying areas that could sustain a dog park   The City of Hurst will finally have a dog park for the This project has not yet
         with the following amenities: black vinyl coated chain-  benefit and recreation of its citizens.  The dog park  begun.
         link fencing with mow strips; concrete sidewalks   will be located in an existing park, negating the
         connecting dog park to trail system; water fountains   need for additional land, parking, utilities, etc.
         with pet fountain attachments and one Pet Comfort   Without this funding, the City of Hurst will remain   TBD
         Station; benches for patrons; and Doggy Depot   one of the few cities in the area without a dog park.
         Stations.



         The project involves the removal of older playgrounds  Playground replacement provides an overall   This project is in the   O&M impact due to
         in the Park System and replacing them with modern,   enhancement to the park system that is necessary  planning phase.    maintenance and labor
         safer playgrounds, like the one recently installed at   due to the age of the parks.       to maintain park.
         Jaycee Baker Park which also included shade
         structures.  Playground replacement will be phased out
         so that eventually all parks will have new playgrounds.
         Project funding from the Half Cent Sales Tax Fund.