Page 506 - Hurst FY19 Approved Budget
P. 506
PUBLIC WORKS
530 STORM WATER MANAGEMENT FUND
0664 STREETS / DRAINAGE
• Vegetation control in channels.
• Respond to emergency complaints within thirty minutes and resolve within
seventy-two hours.
GOALS, OBJECTIVES & PERFORMANCE MEASURES
Council Priorities:
Public Safety Innovation
Economic Vitality Redevelopment
Infrastructure Leadership
Goals:
• Identify drainage issues for Engineering Division.
• Maintain the drainage systems in a condition for efficient and safe passage of
storm water.
• Control vegetation in channels by mowing or through chemical application.
• Maintain Surface Drainage Program which includes curb and gutter, driveways,
sidewalks and valley gutters.
Objectives:
• Street sweeping. ‡
• Manage the surface drainage program.
• Vegetation control. †
• Inspections and repairs of channels and bridges. *
• Inlet inspections and decals. ‡
• Implementation of the integrated storm water management (iSWM) plan. ‡
• Maintain the drainage system and clear obstructions before and after rain
events. ‡
* - Short Term (0-3 years)
† - Intermediate Term (3-10 years)
‡ - Long Term (10+ years)
489