Page 362 - Hurst FY19 Approved Budget
P. 362

PUBLIC WORKS

                                                   510 ENTERPRISE FUND
                                                     0663 ENGINEERING






                       MISSION STATEMENT


                       To provide for effective administration of Public Works activities that
                       ensures safe and efficient water and sewer systems.  To ensure that

                       all water and sewer improvements, as well as all City projects, are
                       designed and constructed in accordance with City regulations and
                       accepted engineering and construction principles and practices..



                       DIVISION DESCRIPTION


                       The Engineering/Construction Division of the Public Works Department is responsible
                       for the overall supervision and administration of engineering and construction
                       activities.   The Engineering Division is responsible for reviewing and/or preparing
                       construction plans, issuing permits, and inspecting new construction of all public water
                       and sanitary sewer systems.  The Engineering Division also reviews and prepares long-
                       range planning for water and sanitary sewer improvements.  The GIS staff within the
                       Engineering Division prepares and maintains the water and sanitary sewer inventory
                       system, and maintains and updates all water and sanitary sewer maps.


                       PRIOR YEAR RESULTS & ACCOMPLISHMENTS


                         •   Completed design of the 44th  Year CDBG Grant Project / Sheri Lane from Reed
                          to Cavender (water and sewer portion).
                         •   Completed construction of Pipeline Road Phase 2 (water and sanitary sewer
                          portion).
                         •   Coordinate with Trinity River Authority on beginning construction of Walker-
                          Calloway Wastewater Outfall System Rehabilitation Project, Phase 1.
                         •   Coordinate with Trinity River Authority on beginning design of Walker-
                          Calloway Wastewater Outfall System Rehabilitation Project, Phase 2.
                         •   Completed design and began construction of Valley View Branch Sanitary
                          Sewer Interceptor Replacement / SH10 to West Redbud Dr.
                         •   Began design of the Precinct Line Road Elevated Storage Tank Monitoring and
                          Treatment Unit.
                         •   Review of numerous private developments with public water and sanitary
                          sewer.








                                                             345
   357   358   359   360   361   362   363   364   365   366   367