Public Works - Stormwater Drainage
                                                      116-535-001




             Expenditures by                     2015-16      2016-17     2017-18      2017-18     2018-19
             Major Object                         Actual       Actual      Budget     Estimate   Approved

             Personnel Services                  455,736      492,963     524,394      523,345      549,651
             Supplies                             16,889       15,648       34,700      34,631       29,700
             Maintenance                         117,983       89,951     125,000      124,750      125,000
             Services                            240,979      257,579     350,440      349,739      234,655
             Insurance                                 0            0           0            0      162,006
             Capital Outlay                       46,227       30,151     197,000      196,606      210,000
             Transfers                           293,672      257,127     108,110       95,418      108,300

             Total                              1,171,487   1,143,420    1,339,644   1,324,489    1,419,312





             Objectives

              - Excavate, re-grade and re-sod 12,000 linear feet of roadside ditches and outfalls.
              - Clean, reset and replace 800 linear feet of reinforced concrete pipe.

              - Inspect and clean 950 restricted underground storm sewer structures.
              - Respond to citizen concerns in a timely manner, reducing the possibility of recurring flood situations.
              - Repair damaged gutter lines reducing the amount of ponding water on curb and gutter streets.
              - Perform required erosion control on above-ground drainage facilities.
              - Clean and remove brush and debris along bridge embankments at road crossings, reducing the possibility
                of damage to bridge structures.





                                                 2015-16      2016-17     2017-18      2017-18     2018-19
             Performance Indicators               Actual       Actual      Budget     Estimate   Approved

             Ditch excavation (linear feet)       11,490       11,047       12,000      11,500       12,000
             Reset reinforced concrete pipe              510    1,305         800        1,200         800
             (linear feet)
             Clean storm sewer structures (ea)       787          953         950          880         950
             Clean debris adjacent to bridges                 4     4           4            4            4
             (times / year)
             Sweeping miles                       25,056       21,524       17,000      22,000       17,000