FY 2018‐19 KELLER FEE SCHEDULE
Water Service Tap/Meter Long Tap and Meter Installation
(Corporate City Limits) ⅝˝ ‐ $800
(cont.) ¾˝ ‐ $825
1˝ ‐ $850
1½” ‐$ 1,275
2˝*** ‐$ 1,425
2” Compound Meter ‐ $2,725
Install meter only
⅝˝ ‐ $275
¾˝ ‐ $300
1˝ ‐ $325
1½” ‐ $725
2˝*** ‐ $775
2” Compound Meter ‐ $2,075
* Water main and service on same side of street
**Water service (meter installation) on opposite side of street from water
main may include bore fees
*** Cost includes a 2” turbine or disc‐type meter
Outside City – Cost as determined on a case by case basis by Director of
Public Works based on actual costs and impact to the system
3˝ or more—Actual meter cost plus service charge fees.
Sewer Service Tap $350 – 4‐inch tap within the City (if contractor required due to extenuating
(Corporate City Limits) circumstances, contractor costs are to be borne by the applicant)
Actual cost – larger than 4‐inch tap within the City
Outside City – Cost as determined on a case by case basis by Director of
Public Works based on actual costs and impact to the system
Water/Sewer Connection Bore Costs Bore fee to apply as needed based on actual linear foot cost
Street Lights $10.50 per month per pole (maximum of 24 months)
Sanitary Sewer Camera Fee $225 each – per residential building permit
Old Town Keller Asphalt Parking • Existing buildings/facilities – actual cost of materials
• New buildings/facilities and existing buildings/facilities with privately
funded improvements exceeding $50,000 – no cost
Public parking space construction scope and schedule to be at the discretion
of the Department of Public Works and dependent upon the availability of
funding as determined by the City