FIVE‐YEAR CAPITAL IMPROVEMENTS PROGRAM (CIP) IMPACT ON OPERATING BUDGET

                                         FY 2017‐18 &
            Fiscal Year                               FY 2018‐19  FY 2019‐20   FY 2020‐21  FY 2021‐22  FY 2022‐23
                                            Prior
                                                   WATER SYSTEM PROJECTS

                                                        ACTIVE PROJECTS
                                      The project is related to replacement of an existing transmission main.  Minimal operating impact is anticipated, and can
            Alta Vista 30" Transmission Main
                                      be absorbed within the current mains and services maintenance budget.
            Total                       $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐

                                      The project is related to replacement of an existing pump station.  Minimal operating impact is anticipated, and can be
            Alta Vista Pump Station
                                      absorbed within the current building maintenance budget.
            Total                       $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐
            N. Main St. 8" Water Line (Tommy   The project provides for new water lines along North Main, however, the increase in lines has a minimal impact on
            Tackett Addition)         operating costs and can be absorbed within the current mains and services maintenance budget.
            Total                       $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐

                                      The project provides for new water lines along S. Elm, however, the increase in lines has a minimal impact on operating
            S. Elm St. 8" Water Line
                                      costs and can be absorbed within the current mains and services maintenance budget.
            Total                       $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐
                                      The project is related to replacement of an existing transmission main and is a cost share with the City of Fort Worth.
            Fort Worth 48" Transmission Main
                                      The maintenance and related annual costs are the responsibility of the City of Fort Worth.
            Total                       $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐

                                      The project is related to replacement of an existing water lines.  Minimal operating impact is anticipated, and can be
            2017 SWIFT Projects
                                      absorbed within the current mains and services maintenance budget.
            Total                       $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐
                                      The project relates to cost of moving lines for other capital project and maintenance activities.  Annual maintenance
            2017 Water Utility Relocations
                                      should reduce long‐term costs by avoiding full repairs and/or replacements.
            Total                       $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐

                                      The project relates to a study only which will help determine any future water system needs.  No operational costs will
            Update Water Masterplan
                                      be related to the study.
            Total                       $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐
                                      The project relates to the annual capital maintenance of water lines which is funded thru the operating budget funds.
            2018 Water Service Replacements
                                      Annual maintenance should reduce long‐term costs by avoiding full repairs and/or replacements.
            Total                       $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐

                                      The project relates to the annual capital maintenance of valves which is funded thru the operating budget funds.
            2018 Large Valve Replacements
                                      Annual maintenance should reduce long‐term costs by avoiding full repairs and/or replacements.
            Total                       $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐
                                      The project relates to cost of moving water lines for other capital project and maintenance activities.  Annual
            2018 Water Utility Relocations
                                      maintenance should reduce long‐term costs by avoiding full repairs and/or replacements.
            Total                       $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐

            Chisholm Tr. Water Tank Removal  The project relates to the removal of already decommissioned water tank and has no operating impact.
            Total                       $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐

                                      The project provides for new water lines along US 377, however, the increase in lines has a minimal impact on operating
            Hwy. 377 12" Water Lines
                                      costs and can be absorbed within the current mains and services maintenance budget.
            Total                       $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐
                                      The project relates to the annual capital maintenance of water lines which is funded thru the operating budget funds.
            2019 Water Service Replacements
                                      Annual maintenance should reduce long‐term costs by avoiding full repairs and/or replacements.
            Total                       $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐ $                             ‐
                                      The project relates to the annual capital maintenance of valves which is funded thru the operating budget funds.
            2019 Large Valve Replacement
                                      Annual maintenance should reduce long‐term costs by avoiding full repairs and/or replacements.