Revenue Bond Overview

            Revenue bonds are used to fund construction of city infrastructure such as water and sewer system
            improvements.  Debt service on these bonds is covered by utility ratepayers.  Some projects currently
            under construction that are funded through these types of bonds are:


            -  Alta Vista Water Line Replacement                                                                          Debt Service
            This project provides planning, engineering, design, right-of-way, construction and construction support
            for the replacement of approximately 9,600 linear feet of 36-inch pipe and 9,500 linear feet of 30-inch
            pipe for the City’s water transmission main from the Alta Vista Pump Station. A shared line between
            the City of Southlake and the City of Keller, the Alta Vista water transmission main provides the City
            with potable water from the City of Fort Worth. This line was originally installed in the mid 1980’s and
            has recently seen an increase in age & corrosion-related pipe failures. Replacing these segments of the
            Alta Vista transmission main will ensure the integrity and delivery of the City’s potable water supply by
            replacing pipe that does not meet current design standards and mitigate water loss due to main breaks.
            This project will include a phased construction approach so as not to disrupt the City’s water supply
            during high demand months.


            -  Repainting of the Florence Elevated Storage Tank
            Originally constructed in 2005, the Florence Elevated Storage Tank provides necessary supply and
            pressure for the City’s high pressure plane located on the west side of the City, south of SH 114. The
            City performs annual cleaning and inspections on all of its water storage tanks to ensure the safety
            and integrity of the water supply system. This project will include repairs to structural steel members,
            address any compliance issues due to new regulations, and provide a complete repaint to all internal
            and external surfaces, increasing the longevity of this vital City infrastructure.


            The schedule on the next page shows the City’s outstanding revenue bond debt, including principal and
            interest amounts as well as the bond maturity date.


























                           Alta Vista Water Line                           Florence Elevated Storage Tank