Page 212 - Microsoft Word - FY26 Budget Book Intro
P. 212
FY 2025-26 ADOPTED BUDGET
Mission Statement
To perform maintenance of the channels and drainage systems in a professional manner to provide
safe and efficient flow of storm water runoff, and develop and implement comprehensive and
aggressive flood plain management that is efficient, safe and environmentally friendly.
Division Description
This Division is responsible for maintaining the drainage system consisting of fourteen miles of
open channels, drainage pipes, inlets, curb, and gutters. This division maintains specific channels
and bridges that are inspected by the U.S. Army Corp of Engineers and the Texas Department of
Transportation’s bridge inspection program. This division also performs street sweeping and
responds to all citizen complaints related to drainage.
Prior Year Accomplishments
Managed vegetation control of the channels by herbicide application and mowing
Managed contractors for surface drainage program
Submitted the Annual Storm Water Management Plan report to the Texas Commission on
Environmental Quality (TCEQ)
Maintained the overland and underground storm drainage system as needed
Replaced 410 missing storm drain decals
Swept all Hurst city streets three times
Future Initiatives
Provide Engineering Division a list of drainage facilities that need repair or replacement
Sweep all city streets three times in a year
Bridge and inlet inspections
Replacement of missing storm drain decals
Removal of silt and debris from channels
Respond to emergency complaints within 30 minutes and resolve within 72 hours
211

