              Mission Statement


              To provide for effective administration of Public Works activities that ensures safe and efficient
              storm drain systems and to ensure that all City public drainage improvements are designed and
              constructed  in  accordance  with  City  regulations  and  accepted  engineering  and  construction
              principles and practices.

              Division Description


              The Engineering Division of the Public Works Department is responsible for the overall engineering
              and construction of streets and drainage facilities.  The Engineering Division is responsible for
              reviewing and/or preparing construction plans, issuing permits, and inspecting new construction
              of all street and drainage systems. The Engineering Division also prepares long range planning for
              street and drainage improvements.  The Geographical Information System (GIS) staff within the
              Engineering Division prepares and maintains a storm drain system inventory and updates all storm
              drain maps.

              Prior Year Accomplishments


                    Constructed  2024  miscellaneous  drainage  improvements  on  Hickory  Court,  Hurstview

                     Drive, and Lookout Trail
                    Completed restoration of a segment of Lorean Branch channel banks just north of Cannon
                     Drive
                    Completed replacement of Lorean Branch Bridge on Bedford-Euless Road; the bridge was
                     completed by TXDOT at no cost to the city
                    Prepared and submitted to TCEQ new SWMP in accordance with the latest requirements
                     published by the TCEQ in August 2024
                    Ensured compliance and filed annual verification report with FEMA NFIP to maintain City’s

                     CRS flood insurance premium discount

              Future Initiatives


                    Evaluate, design and construct year 2025/6 channel bank stabilization on Little Bear Creek
                    Utilizing  U.S.  Rep.  Van  Duyne  supported  Federal  funds,  prepare  design  and  construct
                     channel bank stabilization improvements on Walker Branch
                    Implement  latest  compulsory  Storm  Water  Management  Plan  (SWMP)  initiatives  as

                     promulgated  by  FEMA and  adopted  by the  TCEQ  for  period  2024-2029  and  file  annual
                     report
                    5-year recertification for participation in FEMA NFIP to maintain City’s CRS flood insurance
                     premium discount rating