Page 233 - CityofGrapevineFY26AdoptedBudget
P. 233

FY26 DEPARTMENT GOALS AND OBJECTIVES
          Crews will continue addressing ditches and culverts in need along all open ditch roadways in the City.
          The Department will be constructing a new drainage flume on Wintergreen where a new easement was granted to the
          city.
          Crew members will be sweeping streets in leaf collection trucks this fall and winter.
          The Department is going to work on a few issues addressing water seepage onto sidewalks by installing French drains
          in these areas.
          Excavate, re-grade and re-sod 12,000 linear feet of roadside ditches and outfalls.
          Clean, reset and replace 800 linear feet of reinforced concrete pipe.
          Inspect and clean 950 restricted underground storm sewer structures.
          Respond to citizen concerns in a timely manner, reducing the possibility of recurring flood situations.
          Repair damaged gutter lines reducing the amount of ponding water on curb and gutter streets.
          Perform required erosion control on above-ground drainage facilities.
          Clean and remove brush and debris along bridge embankments at road crossings, reducing the possibility of damage
          to bridge structures.



       STATEMENT OF REVENUE AND EXPENSES


                             ACTUALS           ADOPTED BUDGET  ESTIMATED  ADOPTED BUDGET
                               FY2023    FY2024        FY2025    FY2025        FY2026  $ Adopted vs 25 Bud  % Adopted vs 25 Bud

        Revenues
        CHARGES FOR SERVICES  $1,520,316  $1,535,961  $1,540,000  $1,500,000  $1,500,000      ($40,000)           (3%)
        INVESTMENT INCOME      $55,075  $39,814        $17,000  $36,111        $18,277          $1,277             8%
        MISCELLANEOUS              $0  $1,599,737          $0       $0             $0              $0               –
        PREMIUM ON BONDS           $0  $108,826            $0       $0             $0              $0               –
        REVENUES TOTAL       $1,575,391  $3,284,338  $1,557,000  $1,536,111  $1,518,277       ($38,723)           (2%)

        Expenses
        PERSONNEL SERVICES    $535,820  $624,879      $699,812  $709,165      $729,956         $30,144             4%
        SUPPLIES               $24,159  $19,016        $35,700  $15,700        $24,700        ($11,000)          (31%)
        REPAIR & MAINTENANCE  $166,752  $175,236      $125,000  $124,000      $125,000             $0              0%
        MISC SERVICES & CHARGES  $301,417  $409,644   $232,767  $227,911      $234,975          $2,208             1%
        DESIGNATED EXPENSES   $187,348  $223,291      $221,560  $223,517      $205,881        ($15,679)           (7%)
        DEBT SERVICES              $0    $8,563            $0       $0             $0              $0               –
        CAPITAL OUTLAY        $239,893  $1,827,970    $535,000  $266,382      $315,000       ($220,000)          (41%)
        OPERATING TRANSFER OUT  $117,364  $101,680    $332,840  $332,840      $328,221         ($4,619)           (1%)

        EXPENSES TOTAL       $1,572,753  $3,390,280  $2,182,679  $1,899,515  $1,963,733      ($218,946)          (10%)
                                $2,638  ($105,943)   ($625,679)  ($363,404)  ($445,456)             –               –
        Surplus (Deficit)


       REVENUE DETAIL


                                                   ACTUALS                    ADOPTED      ESTIMATED     ADOPTED
                                                          FY2023       FY2024        FY2025       FY2025        FY2026

        Revenues
        STORM DRAINAGE UTILITY FUND
         STORMWATER DRAINAGE FEES                      $1,520,316    $1,535,961   $1,540,000    $1,500,000   $1,500,000
         INTEREST ON INVESTMENTS                         $55,075       $39,814      $17,000       $36,111      $18,277
         OTHER FINANCING SOURCES                             $0      $1,599,737         $0            $0           $0
         OFS BOND PREMIUM                                    $0       $108,826          $0            $0           $0
         STORM DRAINAGE UTILITY FUND TOTAL             $1,575,391    $3,284,338   $1,557,000    $1,536,111   $1,518,277
        REVENUES TOTAL                                 $1,575,391    $3,284,338   $1,557,000    $1,536,111   $1,518,277
                                                             228
   228   229   230   231   232   233   234   235   236   237   238