Page 232 - CityofGrapevineFY26AdoptedBudget
P. 232
STORMWATER DRAINAGE UTILITY FUND
FY2025-26
ADOPTED OPERATING BUDGET
FUND SUMMARY 304-155-155
FOCUS AREA(S)
Infrastructure
DEPARTMENT DESCRIPTION
The Stormwater Drainage Utility (SDUS) Department excavates and regrades roadside ditches and outfalls, cleans
concrete pipe, inspects storm sewer structures, repairs gutter line to reduce ponding of water, provides erosion control
and cleans and removes brush and debris along bridge embankments.
MISSION STATEMENT
The City of Grapevine manages and monitors the discharge of stormwater from the City’s storm system to surface and
ground waters. This program guides the storm drainage system operations of the City and is permitted by the State of
Texas. Under the State Permit, the City manages the following:
MS4 Maintenance Activities
Post-Construction Stormwater Control Measures
Illicit Discharge Detection and Elimination
Pollution Prevention and Good Housekeeping for Municipal Operations
Industrial & High-Risk Runoff
Construction Site Stormwater Runoff
Public Education and Outreach/Public Involvement and Participation
Monitoring, Evaluating and Reporting
FY25 DEPARTMENT ACCOMPLISHMENTS
Crews worked on regrading and rebuilding of culverts and driveways on Forrest Hills, Ridge and Lakeridge to help with
flooding issues.
Crew members worked on several downed trees in various creeks due to storms in May.
The Department was part of the all hands debris clean up across the city due to the wind and rain storm in the early
summer.
Crew members assisted off and on through the year on the Kimball Road Raising Project. Installed a large arch pipe
system in this location.
Cleaned and inspected over 900 inlet structures and swept over 18,000 lane miles of roadway.
227

