CITY OF FOREST HILL


                 STREET IMPROVEMENTS (Continued)


                 Items that are considered in determining priority are water, sanitary sewer and/or storm drain
                 improvements as these projects can be scheduled as complete reconstruction projects or delayed so
                 that utilities can be constructed first. In some cases, streets falling into this category are recommended
                 for 2” overlay or slurry seal work to preclude further pavement deterioration until utility improvements
                 can be completed. An interagency agreement with Tarrant County provides for shared cost related to
                 street base, overlay, and slurry seal.  The county provides labor and equipment, and the city provides
                 supplies.


                 Updates to the 1990 Thoroughfare Plan were made in the 2010 Comprehensive Master Plan. If the
                 pavement structure of the current street section needs rehabilitation exceeding the overlay process,
                 these projects take longer to complete.

                 Some streets which were rehabilitated or reconstructed over the past 10-15 years; they are periodically
                 maintained through crack sealing continue to develop surface cracks. These cracks, if unsealed, can
                 destroy permanent foundation by allowing water to enter the subgrade, causing clay pockets to expand
                 and contract again during dry periods. Therefore, street projects recommend slurry sealing.  Non-
                 recurring or one-time revenues should, to the extent possible, only be used for one-time expenditures
                 (expenditures not expected to recur and requiring future appropriations) to avoid future shortfalls.

                 Mill and overlay repair is less costly as the mill product can be used for recycled material on other
                 projects.
                 WATER and SEWER IMPROVEMENTS


                 Water and Sewer improvements require removal of existing pipe, excavation to required depth,
                 approximately 6” sand below pipe, pipe, approximately 6” sand above pipe, 6” of road base, and 2” of
                 asphalt or permanent road base.

                 FUNDING LINES


                 The adopted budget includes appropriations for projects listed in the five-year CIP-Street program in the
                 general fund, street fund, and water sewer fund.  As these projects are completed, the capitalizable
                 value will be moved to the Capital Improvements Fund.  Costs are addressed on a project-by-project
                 basis and potentially funded from available fund balance in the Capital Projects Fund.