Page 112 - CityofSaginawFY25Budget
P. 112

CITY OF SAGINAW
                        GOALS, OBJECTIVES AND PERFORMANCE MEASURES
                                                       2024-2025


                                                    PUBLIC SERVICES

                        ANNUAL OBJECTIVES                                2023-2024 PERFORMANCE
            On call personnel will respond to calls within 30 minutes All on call personnel calls were respsonded within 30
            after receiving the call 100% of the time.       minutes after receiving the call.
            Replace stolen or damaged signs within 7 days.   All signs that were stolen or damaged were replaced within
                                                             7 days.

            Repair 75% of the pot holes within 7 days.       100% of the pot holes were repaired within 7 day.s


            Replace broken sidewalks as scheduled.                All broken sidewalks were replaced on schedule.
            Clean debris from all streets twice a year.      Debris was cleaned from all the streets twice a year.


            Respond to weather emergencies (sand streets, set up All weather emergencies were responded to within a timley
            barricades, etc.) in a timely manner.                                  manner.

            Check storm drains monthly.                      Storm drains were checked monlthy.

            Clean the six (6) main drainage channels twice a year.  Twice this year the six main drainage channels were
                                                             cleaned.
            Reduce workers compensation claims by promoting Workers have been informed and trained on safety
            safety on the job.                               protocols.





                                                              2020-2021  2021-2022  2022-2023  2023-2024  2024-2025
                        PERFORMANCE MEASURES
                                                              ACTUAL     ACTUAL    ACTUAL    ACTUAL     BUDGET
            STREETS
            Scheduled Sidewalk Repairs Completed               100%       100%      100%       100%      100%
            Pot Holes Repaired                                  147        80         41        36        40
            Crack Seal Streets (Linear Feet)                     0       11,200       0         0          0
            DRAINAGE
            Culverts Cleaned (Feet)                             4,355     7,313     3,996      4,900     4,500
            Percent of Storm Drains Checked Monthly (32)       100%       100%      100%       100%      100%
            BUILDING MAINTENANCE
            Building Maintenance Jobs Completed                 326        338       116        60        80
            Sprinkler System Maintenance/Repair Jobs             19        39         3         10         7
            OTHER
            Contract Mowing Expenditures                      $114,235   $75,340   $121,065  $198,538  $195,425
            Workers Compensation Claims                          0          5         2         5          0

















                                                                                                          105