                                       Infrastructure Scorecard (cont.)

                                                                      FY 2022    FY 2023     FY 2024    FY 2025
              Dept.                     Key Measures
                                                                      Actual      Actual    Estimate    Target

             AM          Residential Waste Diversion Rate (%)          New
                                                                    Measure in
                                                                      FY 2023         16%        14%        14%

             AM          Electronics Recycled (lbs)                    New
                                                                    Measure in
                                                                      FY 2023      25,196      50,000     50,000
             AM          Major building components operating within their
                         designed life [annual measures]:
                         Roofs:
                           Asphalt [25 Years of Service Life]             88%         88%        78%        78%
                           Metal [25 Years of Service Life]               68%         68%        57%        57%
                           Built-up [25 Years of Service Life]            68%         68%        61%        61%
                           Modified [25 Years of Service Life]           100%        100%       100%       100%
                           Misc. [25 Years of Service Life]               50%         50%        50%        50%
                         HVAC [15 Years of Service Life]                  60%         59%        53%        53%
                         Generators [20 Years of Service Life]            74%         74%        75%        75%
                         Elevators:
                           High Usage [15 Years of Service Life]          56%         50%        31%        31%
                           Low Usage [35 Years of Service Life]           80%         50%        40%        40%
                         Boilers [25 Years of Service Life]               63%         63%        52%        52%
                         Water Heaters [15 Years of Service Life]         18%         18%        27%        27%
             PWK         Percentage of residential street lane miles swept
                         compared to annual goal of 1,642.25              77%        100%        51%       100%
             PWK         Percentage of pothole repairs completed within 3
                         business days                                    85%         94%        98%        90%

             PWK         Percentage of initial contact with citizens
                         reporting street maintenance concerns occurring
                         within 2 business days                           93%         95%        94%        95%
             PWK         Number of square yards of failed concrete
                         excavated and replaced                         39,236     39,178      19,611     40,000
             Water       Clean a minimum of 20% of sewer lines size 6"-
                         15" estimated to assure compliance with the
                         TCEQ Sanitary Sewer Overflow Initiative        41.75%      33.9%        20%        20%
             Water       Radio Transmitter installations                 8,704     10,732      10,000     10,000
             Water       Linear footage of water and sewer lines designed
                         by the City Engineering staff                  32,020     30,249      30,000     30,000
             Water       High hazard backflow assemblies with certified
                         testing completed                               100%        100%       100%       100%
             Water       Avoid any TCEQ, OSHA, SDWA and NPDES
                         violations                                      100%         10%       100%       100%
             Water       Maintain metered ratio rolling average above
                         88%                                            89.57%        89%        92%       > 88%
             Water       Achieve ≤ 8 Sanitary Sewer Overflows per 100
                         miles of sewer main                               4.3          5         6.8        ≤ 8
             Water       Interrupt time per customer (hours per customer)   2.8      1.06         < 4        < 4