Page 70 - CityofMansfieldFY24Budget
P. 70
Summary of Utility Construction Projects
Note: costs include the expected collection of impact fees and may vary from amounts
borrowed depending upon the anticipated collection of impact fees.
FY 2024 - $54,850,000
• 16” Water Line - SH 360
• 30” Lone Star Phase II
• Water Treatment Plant Expansion
• 12” Water Line - US 287
• Miscellaneous Utilities for Roadway Projects
FY 2025 - $48,000,000
• Watson Branch Sewer Line – US 287
• Lone Star Elevated Storage Tank (design)
• 12/16” Water Line along US 287
• 42” Walnut Creek Sewer Line (design)
• 12” Water Line along N. Main Street (design)
FY 2026 - $17,807,000
• Lone Star Elevated Storage Tank (construction)
• 12” Water Line along N. Main Street (construction)
• 16” Water Line along Britton Road (design)
• 24” Water Line along US 287
• 12” Water Line along Turner Warnell Road
• Upper Pressure Plain Water Lines
FY 2027 - $18,719,800
• 42” Walnut Creek Sewer Line (construction)
• 16” Water Line along Britton Road (construction)
• 12” Sewer Main near Magnolia Street
• 12” Water Line near northern city limits
• 20” Water Line along US Highway 287
• 36” Sewer Main along Walnut Creek
70