                                             Capital Project Request



           Department:    PUBLIC  WORKS                                    Date  Prepared:   March  29, 2023
           Submitted  By:   MAJOR JONES                                    Date Completed:
           Project  Title:   51 ST CDBG LINE REPLACEMENT —  FAIR OAKS BLVD/ SHELMAR    DRIVE
                          WASTEWATER
           Project  Type:                               Sub -Type:  MAIN REPLACEMENT
                                                                     B
           Project  Code:                               Priority:
           RELATIONSHIP   TO OTHER   PROJECTS   AND/ OR  MASTER   PLAN:
           The wastewater mains included in this project are part of the City' s Wastewater System Master Plan.














           PROJECT   DESCRIPTION:
           The project consists of the replacement of the following wastewater mains:

           1.  Along Fair Oaks Boulevard from Shelmar Drive to Lone Oak Circle and
           2.  Along Shelmar Drive from Aransas Drive to Cedar Ridge Terrace.




           51 st year CDBG project)

           PROJECT   SCHEDULE:
           FY2026







           JUSTIFICATION:
           Many wastewater mains throughout the City are 50+  years old.  Most of these lines are clay tile and are susceptible to
           ground movement,  pulled joints,  root infiltration,  and deterioration from hydrogen sulfide gas.  Many are substandard
           in size and have inflow/ infiltration problems.  This project is part of the systematic replacement of wastewater mains
           using a worst -first approach to reduce maintenance costs and customer problems.

















                Ordinance No.  2360,  Page 228 of 326