City of Euless
Capital Project Request
Department: PUBLIC WORKS Date Prepared: March 29, 2023
Submitted By: MAJOR JONES Date Completed:
Project Title: 51 ST CDBG LINE REPLACEMENT — FAIR OAKS BLVD/ SHELMAR DRIVE
WASTEWATER
Project Type: Sub -Type: MAIN REPLACEMENT
B
Project Code: Priority:
RELATIONSHIP TO OTHER PROJECTS AND/ OR MASTER PLAN:
The wastewater mains included in this project are part of the City' s Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Along Fair Oaks Boulevard from Shelmar Drive to Lone Oak Circle and
2. Along Shelmar Drive from Aransas Drive to Cedar Ridge Terrace.
51 st year CDBG project)
PROJECT SCHEDULE:
FY2026
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are susceptible to
ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas. Many are substandard
in size and have inflow/ infiltration problems. This project is part of the systematic replacement of wastewater mains
using a worst -first approach to reduce maintenance costs and customer problems.