Page 118 - Euless ORD 2360 Adopted FY 23-24 Budget
P. 118

City of Euless

                                            Capital Project Request

                                                                                                    April 29, 2022
           Department:            PUBLIC WORKS                                 Date  Prepared:
           Submitted By:          HAL CRANOR                                   Date Completed:
           Project  Title:        LINE  REPLACEMENT —  TRAILWOOD ADDITION
           Project  Type:         WASTEWATER                  Sub - Type:   MAIN  REPLACEMENT

           Project Code:          WW2304                      Priority:   A
           COUNCIL  AUTHORIZATION:
            November 22,  2022:  Authorized the City Manager to negotiate and execute an engineering services contract
           with Plummer Associates,  Inc. for the design of the FY2023 Sanitary Sewer Rehabilitation Project.










           RELATIONSHIP   TO OTHER PROJECTS AND/ OR MASTER PLAN:
           The wastewater mains included in this project are part of the City's Wastewater System Master Plan.










           PROJECT   DESCRIPTION:
           The project consists of the replacement of wastewater mains in the Trailwood Addition including those along
           Trailwood Drive,  Cripple Creek Drive,  Shenandoah Drive,  Timberlane Terrace,  Summit Ridge Drive,  and Shadow
            Lane.  See project map for additional details on specific line locations.








           PROJECT SCHEDULE:
            Began  Design:   December  2022
           Anticipate Design Complete:  August 2023
           Anticipate Begin Construction:  January 2024
           Anticipate Construction  Complete:  September 2024





           JUSTIFICATION:
            Many wastewater mains throughout the City are 50+  years old.  Most of these lines are clay tile and are
            susceptible to ground movement,  pulled joints, root infiltration,  and deterioration from hydrogen sulfide gas.
            Many are substandard in size and have inflow/ infiltration problems.  This project is part of the systematic
            replacement of wastewater mains using a worst -first approach to reduce maintenance costs and customer
            problems.




                Ordinance No.  2360,  Page 118 of 326