Business Plan
Enhance Regional Mobility
Goal 2: Plan, Manage, and Maintain Public Transportation Infrastructure
Objective 1: Optimize Effectiveness and Efficiency of Existing Transportation System
Project Performance Measure(s) Department(s)
ERM I-30 and SH-360 Interchange Overall satisfaction with the Management Public Works
2.1.2 of Traffic Flow During Peak Hours
Summary:
Estimated Actual
The purpose of this TxDOT project is to improve traffic Milestone Completion Completion
safety and reduce traffic congestion at the interchange of Package A Construction Spring 2023
Interstate 30 and State Highway 360. Formerly a toll road Package B Construction Spring 2023
loop interchange, the new infrastructure will include main Package C Construction Pending
lane improvements and direct connection ramps to each Package D Construction Pending
facility. Package E Construction Summer 2020 Apr. 2021
This project is split into the following five construction
phases:
• Package A: Reconstruction of the Six Flags Drive
Bridge over I-30
• Package B: I-30/SH-360 interchange
improvements
• Package C: Great Southwest Industrial District
railroad bridge crossing just south of Randol Mill
Road
• Package D: Randol Mill Road interchange
improvements
• Package E: Improvements from Abram Street to
I-20