Page 208 - ArlingtonFY24AdoptedBudget
P. 208

Special Revenue Funds





            STREET MAINTENANCE FUND: Keith Brooks, P.E., Director
            Department Narrative                        Business Plan Goals and Objectives

            The Field Operations Division is responsible for   •  Goal: Plan, Manage, and Maintain Public Transportation
            the maintenance of street and traffic infrastructure   Infrastructure
            within the City of Arlington. The goal is to keep all   o  Objective: Optimize Effectiveness and Efficiency of Existing
            assets free of hazards and operating as designed    Transportation System
            for  the  safety  of  the  public.  Street  and  Traffic   o  Objective; Complete Construction Projects in a Timely
            Divisions are funded within the Street              Manner
            Maintenance Fund.  The Street Maintenance   •  Goal: Ensure Availability of Information, Programs, and City
            quarter  cent Sales Tax provides funding for all   Services
            major street maintenance  programs. Programs    o  Objective: Implement New Technology
            associated with Street Maintenance include:

            •  Street  Resurfacing  and   preventative  Budget Highlights
               maintenance programs                     •  Carry-forward Funding for PW New South Field Operations
            •  Concrete repair of pavement, sidewalks, curb   Facility & Stormwater Compliance Improvements $250,000
               and gutter                               •  One-time Funding for Contracted Street Maintenance $5,000,000
            •  Emergency Operations in response to severe   (Offset)
               weather, snow, or ice                    •  Increased Recurring Funding to Replace Overhead Digital
            •  Multiple other activities to assist the public.   Message Signs $90,000

            The Traffic Division is also supported with capital
            bond funds for construction of new signals.
            Maintenance programs performed by this group
            include the following:


            •  Maintenance of signals for rebuilds and new
               construction, controllers, wiring, loops, mast
               arms, and cameras.
            •  Streetlight maintenance to include replacing
               bulbs, repair  wiring, and replacing  poles
               knocked down by vehicular traffic.
            •  Sign maintenance program to maintain Texas
               Manual on Uniform Traffic Control Devices
               (TMUTCD)  sign inventory standards and
               replacement of damaged poles and signs.
            •  Street  markings  maintenance program to
               ensure   compliance   with   TMUTCD
               specifications.

            At A Glance
             •  92 Authorized Positions
             •  Budget Break Down
                 Personnel Services      $7,130,749
                 Operating Expenses        27,793,082
                 Capital Outlay        1,203,400
                 Total               $36,127,231





            FY 2024 Adopted Budget and Business Plan                                        199                                                                City of Arlington, Texas
   203   204   205   206   207   208   209   210   211   212   213