CAPITAL IMPROVEMENTS  PROGRAM (CIP)

                                   STORM WATER


                         Funding   Total Prior                                               Beyond /
          Project number                     FY 2023   FY 2024  FY 2025   FY 2026   FY 2027              Total
                          Source   Funding                                                   Unfunded
          West Jones    Funding is planned for the design and construction of drainage improvements at West Jones Branch and Shady Lane. The
          Branch at Shady  proposed improvements include the addition of one 10-foot x 10-foot box culvert, raise and replace the roadway, clear and
          Lane          grade the channel, and install channel stabilization consisting of interlocking concrete blocks.
                        Storm
          2023-18       Water Utility    $0        $0        $0       $0        $0        $0   $500,000  $500,000
                        System



          Dove Creek at   Funding is planned for the design and construction of drainage improvements. The proposed improvements include the
          North Carroll   construction of five 10-foot x 7-foot box culverts, raise and replace the roadway, clear and grade the channel, and install
          Avenue        channel stabilization consisting of interlocking concrete blocks.

                        Storm
          2022-53       Water Utility    $0        $0        $0       $0        $0        $0  $1,800,000  $1,800,000
                        System



          Big Bear 6 at
          East Continental   Funding is planned for the design and construction of drainage improvements. The proposed improvements include the
                        construction of six additional 12-foot x 8-foot box culverts, raise and replace the roadway, and clear and grade the channel.
          Boulevard
                        Storm
          2022-54       Water Utility    $0        $0        $0       $0        $0        $0  $3,150,000  $3,150,000
                        System


          Drainage
          improvements at
          North Peytonville Funding is planned for engineering, design and construction for the drainage improvements between 1330 North Peytonville
          from 1330 North  to Post Oaks Creek. Improvements include installation of storm water lines, box culverts and curb inlets.
          Peytonville to
          Post Oaks Creek
                        Storm
          2022-52       Water Utility   $450,000   $0        $0       $0        $0        $0  $5,650,000  $6,100,000
                        System




        Stormwater Total           $4,075,000  $1,785,000  $1,090,000  $450,000  $450,000  $450,000 $21,290,000 $29,590,000