Page 372 - Southlake FY23 Budget
P. 372

CAPITAL IMPROVEMENTS  PROGRAM (CIP)
                                                                                 Sewer
                                                                                 SEWER


                             Funding   Total Prior                                               Beyond /
              Project number                     FY 2023  FY 2024   FY 2025   FY 2026  FY 2027               Total
                             Source    Funding                                                   Unfunded
              Matching Funds


              System Capacity
              Improvements   Funding provides resources to reimburse developers for the oversizing of sanitary sewer lines to meet the requirements of
                            the Southlake 2030 Wastewater Master Plan in cases where the developer is not required to provide the ultimate size of the
              (Sewer) - Future   line to serve proposed developments.
              Projects


                            Sanitary
              2022-41       Sewer       $925,000   $80,000  $85,000   $90,000   $95,000  $100,000  $105,000  $1,480,000
                            Impact Fee


              Future Projects

              15-inch Sewer   Funding is planned for engineering design and construction to replace existing 12-inch, 10-inch, and 8-inch interceptor lines
              Line in Basin   with 15-inch and 10-inch lines in Basin N-12 and N-12a along Dove Creek south of State Highway 114. This sewer line
              N-12 and N-12a  crosses State Highway 114 to serve the Milner Tract, Methodist Hospital, Summerplace, and Chapel Downs.

                            Sanitary
              2022-42c      Sewer            $0        $0       $0   $325,000  $600,000  $365,000       $0  $1,290,000
                            Impact Fee
              2022-42c      Utility Fund     $0        $0       $0        $0        $0  $3,660,000      $0  $3,660,000
                            Total            $0        $0       $0   $325,000  $600,000  $4,025,000     $0  $4,950,000



              Wastewater Total         $3,025,000  $1,405,000  $3,287,985  $1,379,908  $1,145,780  $4,619,115  $2,105,000 $16,967,788
              Construction









































                                                                             BUDGET BOOK   |  FY 2023 City of Southlake  371
                                                                                           WWW.CITYOFSOUTHLAKE.COM
   367   368   369   370   371   372   373   374   375   376   377