Page 365 - Cover 3.psd
P. 365
ADOPTED | BUDGET
Facilities Capital Projects
Project Name Project Description
Equipment Replacement This project consist of replacing icemakers at Fire Stations #2 and Fire Station #3 (7,000) and a floor
and Floor Drain - Continuing drain at Fire Station #5 ($3,000)
Project
Fencing around Fire This project consists of installation of the two remaining sides of the wrought iron fencing and gates at
Training pad - Continuing the Fire Training Pad.
Project
Fire Station #2 - overhead This request is to replace the overhead doors at Fire Station #2.
doors - New Project
General Maintenance and This project is to repair the roof at the Public Library ($25,000).
Repairs - New Project
Generator Feasibility Study The purpose of the generator feasibility study is to provide a report evaluating the feasibility of electrical
and Equipment - Continuing equipment upgrades. The project will evaluate (13) facilities.
Project
Generator HMGP Grant - The city of NRH is applying to the FEMA Hazard Mitigation Grant Program DR-4485 (COVID-19) for (2)
New Project generators that will supply a permanent secondary source of power to the Public Works Service
Center/Fleet Maintenance building and the Fire Maintenance/Fleet & Facilities Administration building.
Both city buildings are located on Dick Fisher Dr.
361 NRH | TEXAS