Page 365 - Cover 3.psd
P. 365

ADOPTED | BUDGET


                                Facilities Capital Projects


           Project Name                                        Project Description
         Equipment Replacement   This project consist of replacing icemakers at Fire Stations #2 and Fire Station #3 (7,000) and a floor
         and Floor Drain - Continuing   drain at Fire Station #5 ($3,000)
         Project







         Fencing around Fire    This project consists of installation of the two remaining sides of the wrought iron fencing and gates at
         Training pad - Continuing   the Fire Training Pad.
         Project








         Fire Station #2 - overhead   This request is to replace the overhead doors at Fire Station #2.
         doors - New Project









         General Maintenance and   This project is to repair the roof at the Public Library ($25,000).
         Repairs - New Project










         Generator Feasibility Study   The purpose of the generator feasibility study is to provide a report evaluating the feasibility of electrical
         and Equipment - Continuing   equipment upgrades. The project will evaluate (13) facilities.
         Project








         Generator HMGP Grant -   The city of NRH is applying to the FEMA Hazard Mitigation Grant Program DR-4485 (COVID-19) for (2)
         New Project            generators that will supply a permanent secondary source of power to the Public Works Service
                                Center/Fleet Maintenance building and the Fire Maintenance/Fleet & Facilities Administration building.
                                Both city buildings are located on Dick Fisher Dr.














                                                             361                                     NRH  | TEXAS
   360   361   362   363   364   365   366   367   368   369   370