Page 297 - HurstFY23AnnualBudget
P. 297

APPROVED BUDGET FISCAL YEAR 2022-2023






                                                       CITY OF HURST
                 STORM DRAINAGE FUND                  ADMINISTRATION                          0664 STREETS


               MISSION STATEMENT

               To perform maintenance of the channels and drainage systems in a professional manner to
               provide  safe  and  efficient  flow  of  storm  water  runoff,  and  develop  and  implement
               comprehensive  and  aggressive  flood  plain  management  that  is  efficient,  safe  and
               environmentally friendly.

               DIVISION DESCRIPTION

               This Division is responsible for maintaining the drainage system consisting of fourteen miles of
               open channels, drainage pipes, inlets, curb, and gutters.  This division maintains specific channels
               and bridges that are inspected by the U.S. Army Corp of Engineers and the Texas Department of
               Transportation’s bridge inspection program.  This division also performs street sweeping and
               responds to all citizen complaints related to drainage.

               PRIOR YEAR RESULTS & ACCOMPLISHMENTS

                   ✓  Managed vegetation control of the channels by herbicide application and mowing.
                   ✓  Managed contractors for surface drainage program.
                   ✓  Submitted the Annual Storm Water Management Plan report to the Texas Commission
                       on Environmental Quality (TCEQ).
                   ✓  Maintained the overland and underground storm drainage system as needed.
                   ✓  Replaced 158 missing storm drain decals.

                   ✓  Swept all Hurst city streets three times.

               FUTURE INITIATIVES

                   ➢  Provide Engineering Division a list of drainage facilities that need repair or replacement.
                   ➢  Sweep all city streets three times in a year.
                   ➢  Bridge and inlet inspection.
                   ➢  Replacement of missing storm drain decals.
                   ➢  Removal of silt and debris from channels.

                   ➢  Vegetation control in channels.
                   ➢  Respond to emergency complaints within thirty minutes and resolve within seventy-two
                       hours.









                                                             297
   292   293   294   295   296   297   298   299   300   301   302